My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-21_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2017-02-21_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 8:15:08 AM
Creation date
2/21/2017 4:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
2/21/2017
Doc Name
Request for Technical Revision
From
Battle Mountain Resources, Inc.
To
DRMS
Type & Sequence
TR34
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Geotechnical Investigation Report Ms. Deb Miller <br />San Luis Tailings Impoundment Drop Structure Miller Geotechnical Consultants <br />TABLE OF CONTENTS <br />1.0 <br />INTRODUCTION.........................................................................................................1 <br />2.0 <br />FIELD INVESTIGATION............................................................................................2 <br />2.1 <br />Subsurface Conditions Observed in Test Pits...................................................2 <br />2.2 <br />Subsurface Conditions Observed in Soil Borings.............................................3 <br />3.0 <br />LABORATORY <br />TESTING..........................................................................................4 <br />4.0 <br />GEOTECHNICAL <br />ANALYSES...................................................................................6 <br />4.1 <br />Slope Stability.....................................................................................................6 <br />4.1.1 <br />Modeling Parameters......................................................................................6 <br />4.1.2 <br />Results for Drop Structure Slope Stability.....................................................7 <br />4.1.3 <br />Results for Conveyance Channel Slope Stability...........................................7 <br />4.1.4 <br />Summary of Stability Results.........................................................................7 <br />4.2 <br />Seepage Analysis................................................................................................8 <br />4.2.1 <br />Modeling Parameters......................................................................................8 <br />4.2.2 <br />Seepage Results...............................................................................................8 <br />4.3 <br />Filter Design.......................................................................................................9 <br />4.4 <br />Pipe Perforation Designs....................................................................................9 <br />4.5 <br />Bearing Capacity................................................................................................9 <br />4.6 <br />Lateral Earth Pressure......................................................................................9 <br />4.7 <br />Resistivity.........................................................................................................10 <br />4.8 <br />Sulfates.............................................................................................................10 <br />5.0 <br />DESIGN CONSIDERATIONS...................................................................................11 <br />5.1 <br />Cut and Fill Slopes...........................................................................................11 <br />5.2 <br />Foundations......................................................................................................11 <br />5.3 <br />Below Grade Walls...........................................................................................12 <br />5.4 <br />Foundation Drains...........................................................................................12 <br />5.5 <br />Corrosion..........................................................................................................12 <br />5.6 <br />Sulfates.............................................................................................................12 <br />5.7 <br />Site Preparation and Fill Placement................................................................12 <br />December 23, 2015 i Engineering Analytics, Inc. <br />Rev]. <br />—Jan 5, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.