Laserfiche WebLink
A 36 -inch thick layer of riprap is being placed for a short distance of 13-20 ft. downstream of the <br />discharge. This riprap is incorporated to provide protection from turbulence at the basin <br />discharge at higher flows and from end sill wall overtopping at lesser flows, until such time as <br />downstream tail water develops to provide a water cushion. <br />Calculations associated with the discharge channel are provided in Appendix C-4. <br />3.3 South Diversion Ditch Channel Hydraulics Design <br />Analysis of the South Diversion Ditch revealed that relatively minimal "reshaping" and <br />regrading of the existing channel geometry would increase the conveyance capacity of the ditch <br />to convey runoff events through the PMF. Specifically, the existing channel bottom has <br />somewhat rounded corners, and much of the ditch profile is at an adverse grade (i.e., the ditch <br />doesn't freely drain towards the drop structure); the reshaped geometry is described in Table 3.3. <br />Table 3.3. South Ditch - Reshape Channel Geometry <br />Feature <br />Measure <br />Channel Slope <br />0.20% <br />Bottom Width <br />15 ft <br />Left Side Slope (looking up -channel) <br />2H:1V <br />Right Side Slope (looking up -channel) <br />1.5H:1V (or flatter) <br />Channel Roughness (n) <br />0.025 <br />The Drop Structure has been designed to pass a maximum discharge of 1,522 cfs. Basins A and <br />B comprise approximately 88% of the area contributing runoff to the South Diversion Ditch. <br />Limiting the flow in the South Diversion Ditch below Basin B (approximately channel Station <br />28+50) to a maximum of approximately 1,600 cfs will protect the drop structure from flows that <br />exceed its design capacity. <br />Consequently, the left bank (impoundment side) of the upper reach of the ditch will be graded <br />down to serve as an overflow section that allows excess runoff to be diverted to the reclaimed <br />area of the tailing impoundment, to be stored behind the dam. <br />At the confluence of runoff from Basin A and Basin B (approximately Station 28+50), there is a <br />"catchment" area where flow from Basin A and Basin B will "pool" to provide attenuating <br />detention storage during the design event. Below this catchment area, the channel geometry <br />becomes uniform, and the flow through the ditch will approach "normal depth". The design <br />invert of the channel at Station 28+50 is 8619.15 ft; normal depth below Station 28+50 for the <br />design discharge of 1,600 cfs is 7.59 ft, producing a water surface elevation upstream from <br />Station 28+50 of 8626.74 ft. <br />Upstream from the catchment area, the left bank of the upper 500 ft of the ditch (station 32+25 to <br />station 37+25) will be graded down to elevation 8625.5 ft and serve as the overflow section <br />allowing runoff in excess of 1,600 cfs to overflow from the ditch into the reclaimed area. During <br />the PMF event, with 1,600 cfs flowing down the ditch, there will be 1.24 ft of water over the left <br />bank, resulting in approximately 1,800 cfs (approximately 41 ac -ft total volume) flowing over <br />------------------------- ---- ---------------------------------------------------------- -- --- <br />San Luis Project - South Diversion Ditch Drop Structure - Final Design Report 23 <br />