My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-21_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2017-02-21_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 8:15:08 AM
Creation date
2/21/2017 4:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
2/21/2017
Doc Name
Request for Technical Revision
From
Battle Mountains Resources, Inc.
To
DRMS
Type & Sequence
TR34
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Batch Plant: Currently certified by the National Ready Mixed Concrete Association. <br />3. Epoxy Injection Applicator: Certified by epoxy manufacturer. <br />E. Pre -construction Meeting: <br />1. Prior to installation of concrete, a jobsite meeting shall be conducted with the <br />Engineer, Contractor, concrete subcontractor, installers of related work, and other <br />involved entities. <br />2. Agenda shall include: <br />a. Mix designs, test of mixes, and Submittals. <br />b. Placement methods, techniques, equipment, and consolidation. <br />c. Water/Cement ratio. <br />d. Entrained air. <br />e. Slump and placement time. <br />f. Finishing and curing. <br />g. Admixture types, dosage, performance, and redosing. <br />h. Quality control testing. <br />i. Other specified requirements. <br />1.3 SUBMITTALS <br />A. All submittal information shall be current and completed no more than one (1) year prior <br />to commencing any related work activities. <br />B. Product Data: Manufacturer's data, recommendations, and instructions for specific use on <br />this project for products listed below. <br />1. Admixtures. <br />2. Bonding agents. <br />3. Bond breaker. <br />4. Patching materials. <br />C. Proposed Mix Design. <br />1. Prior to commencing concrete work, submit and obtain Engineer's approval of <br />certified test reports describing proposed concrete mix design, including: <br />a. Fine aggregate - Source, type, gradation, deleterious substances, and bulk -specific <br />gravity on the basis of weight of saturated surface dry aggregate (ASTM C128). <br />b. Coarse aggregate - Source, type, gradation, deleterious substances, and bulk - <br />specific gravity on the basis of weight of saturated surface dry aggregate (ASTM <br />C 127). <br />Cast -In -Place Concrete February 2017 03300-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.