My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-21_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2017-02-21_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 8:15:08 AM
Creation date
2/21/2017 4:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
2/21/2017
Doc Name
Request for Technical Revision
From
Battle Mountains Resources, Inc.
To
DRMS
Type & Sequence
TR34
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Removal. <br />1. Do not remove or disturb forms until the concrete has attained sufficient strength to <br />safely support all dead and live loads. <br />2. Retain shoring in place and reinforce as necessary to carry any construction equipment, <br />materials, or other loads in excess of cured strength. <br />3. Use care in form removal to avoid surface gouging, corner, or edge breakage, and other <br />damage to the concrete. <br />4. Do not commence form removal earlier than the following schedule. <br />a. Walls and columns not yet supporting loads - twenty-four (24) hours. <br />b. Vertical sides of beams and girders - twenty-four (24) hours. <br />c. Bottom forms and shoring for slabs, beams, and girders under ten feet (10') clear <br />span between supports - seven (7) days. <br />d. Bottom forms and shoring for slabs, beams, and girders between ten feet (10') to <br />twenty feet (20') clear span - fourteen (14) days. <br />e. Bottom forms and shoring for slabs, beams, and girders over twenty feet (20') clear <br />span - twenty-one (21) days. <br />f. Refer to ACI 347, Chapter 2, paragraph 2.7.2.3. for additional requirements. <br />END OF SECTION 03100 <br />Concrete Formwork February 2017 03100-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.