Laserfiche WebLink
N <br />NORTH 0 <br />0 <br />500 0 500 1000 1500 m <br />IN FEET ) <br />1 inch = 500 ft. <br />U <br />j (lbs PLS/acre) <br />LEGEND: <br />I <br />Blue <br />PERMIT BOUNDARY (AFFECTED LAND) <br />10.5 - - <br />Sideoats Grama <br />g - <br />cD <br />0 <br />PROPOSED HAUL ROAD <br />j 0.70 <br />SandDro seed . __ __ _----- 0.05 <br />PROPOSED MINING LIMITS <br />1.10 <br />a) <br />rz <br />EXISTING PARCELS <br />Rates are for drill seeding. If broadcast seeding is used, <br />EXISTING DITCH <br />m2 <br />EXISTING GAS LINE GAS - - <br />D <br />EXISTING OVERHEAD ELECTRIC OHE <br />W <br />EXISTING EASEMENT <br />ry <br />0 <br />EXISTING 5 FOOT CONTOUR <br />O. <br />G <br />EXISTING 25 FOOT CONTOUR ----4700-- <br />o <br />Z <br />PROPOSED 5 FOOT CONTOUR 4880 <br />PROPOSED 25 FOOT CONTOUR 700— <br />PROPOSED RE -VEGETATION <br />Q LL <br />NOTES: <br />1. THE PROPOSED FINAL LAND USE FOR THE PUEBLO COUNTY AGGREGATE <br />PROJECT IS RANGELAND. <br />2. RECLAIMED MINE PIT SIDE SLOPES WILL BE CREATED FROM BACKFILL WITH <br />OVERBURDEN ANDSUBSOIL. <br />3. ALL RECLAIMED SLOPES SHALL BE GRADED TO 3H: 1 V OR FLATTER AND TO <br />RETURN TO HISTORIC DRAINAGE PATTERNS. <br />4. AVAILABLE TOPSOIL AND OVERBURDEN MATERIAL WILL BE USED FOR <br />BACKFILLING. A MINIMUM OF SIX (6) INCHES OF TOPSOIL WILL BE PLACED <br />PRIOR TO SEEDING DURING FINAL RECLAMATION. <br />5. THE SEED MIXTURE FOR THE PROPOSED PERMIT AREA IS LISTED BELOW. <br />Reve etation Seed Mix <br />Job No: <br />Q <br />Rate <br />Species <br />U <br />j (lbs PLS/acre) <br />I <br />BlueBlueGrama 10.5 - - <br />Sideoats Grama <br />g - <br />cD <br />14.10 - --- - <br />Swith rass j 0.70 <br />SandDro seed . __ __ _----- 0.05 <br />Little Bluestem 1.10 <br />TOTAL---- -- - --- 6.45—----------'' <br />Rates are for drill seeding. If broadcast seeding is used, <br />I double -seeding rates. <br />6. PERIODIC INSPECTION FOR NOXIOUS WEEDS, AT LEAST ONCE A YEAR EARLY IN <br />THE SEASON, WILL BE DONE AS PART OF A WEED MANAGEMENT PLAN, <br />7. THE MINE OFFICE/SCALE HOUSE TRAILER, PORTABLE PROCESSING FACILITY, AND <br />ANY OTHER STRUCTURES ASSOCIATED WITH MINING WILL BE REMOVED FROM THE <br />SITE DURING FINAL RECLAMATION ACTIVITIES. <br />8. THE PROCESSING AREAS AND HAUL ROADS SHALL BE SCARIFIED, GRADED AND <br />TOPSOIL ADDED PRIOR TO SEEDING DURING FINAL RECLAMATION. <br />9. BEST MANAGEMENT PRACTICES WILL BE USED TO CONTROL EROSION AND <br />STORMWATER SUSPENDED SEDIMENT RUNOFF FROM THE SITE DURING <br />RECLAMATION ACTIVITIES. <br />HISTORIC GROUND <br />OVERBURDEN (SUBSOIL) <br />MINING SECTION A (CROSSED HATCH) <br />N.T.S. <br />z/—MINING HIGHWALL <br />z <br />22-t J /—HISTORIC GROUND <br />3 <br />6" TOP SOIL <br />OVERBURDEN---` °`wL18—INCHESSUBSOILPITFLOORSUBSOIL) <br />OVERBURDEN (SUBSOIL) <br />MINING SECTION B (SOLID HATCH) <br />N.T.S. <br />MINING HIGHWALL <br />6" TOP SOIL--\ <br />HISTORIC GROUND -- <br />3' <br />71. <br />z g_ <br />wool 0, <br />OVERBURDEN <br />MINING HIGHWALL (SUBSOIL) <br />OVERBURDEN—/PIT FLOOR <br />SUBSOIL) GRADED TO DRAIN <br />18—INCHES <br />OVERBURDEN (SUBSOIL) <br />MINING SECTION C (DIAGONAL HATCH) <br />N.T.S. <br />Date: SEPTEMBER 2016 <br />Job No: <br />Q <br />U z <br />W <br />a <br />Q <br />Zz O cD U <br />D Z <br />Z <br />7Z <br />00. <br />0 W Q <br />OF_ m2 <br />f <br />J <br />00 D z 0 <br />W W <br />ry <br />0 <br />O. <br />GDW <br />V 0. <br />Q LL <br />Date: SEPTEMBER 2016 <br />Job No: <br />z <br />Q <br />W J <br />ELa11. <br />Z <br />m O <br />Q <br />WWJ <br />U <br />w <br />ry <br />Date: SEPTEMBER 2016 <br />Job No: 590-002.03 <br />Drawn: C. Snowdon <br />Design: B. SCHENDERLEIN <br />Checked: B. SCHENDERLEIN <br />Scale: 1 " = 500' <br />Sheet: