Laserfiche WebLink
r <br /> ;,., . • C OLORADCI DIUSIO1 OF REC'L 2NUTION MI IN. AND SAFETY <br /> 1313 Sl maaSaest.Roo�215.Dower.Colorado 90203 ph(3Q3)b66-3.%? <br /> REQUST FOR TECHNICAL RE-k°ISIO1(TR)C 01°ER SHEET <br /> File No.:M- 1993-05_ site Nat, :,Midwestern Farms Pit <br /> cam, Powers TRH ,rz� lfs �s�ortt� <br /> Petxuittee.Midwestern Farms <br /> Operator(If Other than Permittee):Eastern Colorado Aggregate (ECA) <br /> Perruittee Repre.entative: David A. King <br /> Please provide a brief description of the proposed revision: <br /> Reduce depth of top sog to six inches,eliminate tree planting,ei rnir ate wetland planting,change post <br /> rtrning WO use for the 64 arse field to rangeland and recreation,Mr6aSe the maximum disturbed area to 437.E <br /> acres. <br /> A,.defined by the_Ntinerals Rukd .a Technical Rev i,-ion(TR)r.: "a change in the permit or application <br /> which does tit have more than a minor effect upon the approved or proposed Reclamation or <br /> Elm ironmental Protection Plan.- The Division is charged with d,eximin a,g if the revision as submitted <br /> meets thiq definition. If the Division detertnirnes thatthosed rer,-rsion is beyond the scope of a TR. <br /> the Division may require the subauttal of a peraut a to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Dtvi°.ion(as listed below by permit type). Please subunit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee.the Division will <br /> detetxuine if it is approv able within 30 day%,If the Division requires additional wfomatiaa to approve a <br /> TR_you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR.unless the <br /> pet=ttee requests additional time.in wntmg.to provide the required infotmatioa. <br /> There is no pre-deed fotutat for the subpusttal of a TR however.it is up to the petmittee to provide <br /> sufficient information to the Division to approve the TR request,including Mated mining and <br /> reclautation plan maps that accurately depict the changes proposed is the requested TR <br /> Required Fees for Technical Retit..ion by Permit Type-Please meek:the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Repaired TR Fee Subadtied(mart only one) <br /> 1ltk. 111, 112 ccrostyuctiou <br /> materials,and 117 quarries $216 f <br /> 112 bard rock--(not DMO) $1?5 <br /> I IOd. Il2d(1.2 or 3) $1006 <br />