Laserfiche WebLink
MAP <br /> KEY DESCRIPTION DISTURBED AREA Acres <br /> Al Plant Processing/Stockpile Area 221.5 <br /> A2 Sand Beach Area between two ponds 36.5 <br /> A3 SWx/S.Strip of distrubed land-South of Ponds 13.9 <br /> A4 JSEx of disturbed land-South of Ponds 8.7 <br /> Subtotal Disturbed Area 280.E <br /> A5 East Pond Water Surface 23.7 <br /> A6 West Pond Water Surface 72.5 <br /> A7 Pond Dike Breach Water Surface Area 0.9 <br /> Subtotal Water Surface Area 47.1 <br /> A8 East Pond Additional Backslo a Area I 11.0 <br /> Subtotal Additional Distrubed Land 11.0 <br /> A9 Industrial commercial Area(I/C 49.2 <br /> Total Disturbed Area with and without I/C 388.7 437.9 <br /> MAP <br /> KEY REQUIRED RECLAMATION SEEDING AREA ACRES <br /> Al Plant Processing/Stockpile Area 221.5 <br /> A3 SWx/S.Strip of distuubed land-South of Ponds 13.9 <br /> A4 SEx of disturbed land-South of Ponds 8.7 <br /> AS East Pond Additional Backslo a Area 1 11.0 <br /> Total Seeding Areal 255.1 <br /> 16. Please see the revised and legible Exhibit F—Reclamation Plan Map. <br /> 17. Revise Exhibit L— Reclamation Cost with a statement, "The conveyor belt across the <br /> Burlington Northern Railroad tracks has been removed as of this date." The conveyor <br /> crossing the railroad tracks has been demolished. The conveyor parts and equipment will <br /> be removed from the disturbed area south of the railroad and all associated costs of the <br /> removal have deleted from the reclamation costs. <br /> 18. Revise Exhibit L— Reclamation Cost includes the cost of planting the cover crop as a <br /> separate line item. <br /> 19. Revise Exhibit L— Reclamation Cost to include separate line items for 73 acres—ripping sand <br /> stockpile and processing area and 16.6 acres—ripping topsoil stockpile area. <br /> 20. Revise Exhibit L— Reclamation Cost to include a line item for re-top soiling and re-vegetating <br /> all of the 255.1 acres of disturbed land. <br /> 21. Exhibit L includes a line item for "Remove area between two ponds" volume was estimated <br /> as follows: <br /> Cut to breach pond dike = %(Depth of cut)(width of bottom +width at top of bank)(length of <br /> cut) <br /> Cut to breach pond dike = %(13 ft.)(196 ft+40 ft)(143 ft) = 219,362 cf/27 cf/cy= 8,124.5 <br /> bank cy x 1.35% swell = 10,933 loose cy <br />