My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-16_REVISION - M1993059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993059
>
2017-02-16_REVISION - M1993059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:40 PM
Creation date
2/18/2017 12:03:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993059
IBM Index Class Name
REVISION
Doc Date
2/16/2017
From
Eastern Colorado Aggrehates
To
DRMS
Type & Sequence
TR5
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Post mining-49.2 acre Industrial/Commercial Site to be managed by <br /> CR 31 Mid-Western Farms accepted without reclamation of the area. <br /> . US Hwy 50 <br /> �,� 235 12 <br /> 235 A3N1 �r �, <br /> o .T <br /> � k <br /> » <br /> Reclamation Area— <br /> aal Midwestern Farms Permit <br /> No.(M-1993-059) <br /> 5. Pond Area -The sentence "' AkPl; 44411 CA A r,01;t ^f°^ apres after f„II r^,.l-,^.,-,*; ", should be <br /> deleted and revised as follows: "Final reclamation will be achieved by creating a single 97.1 <br /> acre pond." To clarify one pond is achieved by breaching the dike between the two existing <br /> ponds. <br /> 6. Pond Dike Breach —The work will be accomplished with a possible combination of the <br /> following, survey equipment, pickup, service truck, transport truck and trailer, generator <br /> set, electric or diesel pumps, excavator, swamp mats, dozer, loader and haul truck. <br /> a. Regarding an increase in the exposed ground water. Surface Water Increase—The <br /> parties have agreed that Midwestern will provide up to 15 more LAWMA preferred <br /> shares to cover this extra surface water which is sufficient to cover 98.5 acres of <br /> total water surface area. The two existing ponds water surface area is 96.2 acres. <br /> After the breach is constructed, the new single pond surface area will increase by 0.9 <br /> acres to a total water surface area of 97.1 acres. This final water surface area of <br /> 97.1 acres is 1.4 acres less than the 98.5 acres of available water surface area, and <br /> will not require additional water rights to complete the reclamation of this site. <br /> 7. Top Soil — No additional topsoil borrow is required to cover the site. <br /> a. The approximate depth of top soil striping and replacement will be 6 inches. <br /> b. Existing topsoil storage area will have a minimum of 6 inches topsoil after <br /> excavation. <br /> 8. Exhibit F—Reclamation Plan Map - Please see the revised and legible copy of the Exhibit F— <br /> Reclamation Plan Map. <br /> 9. Technical Revision Cover- Please see the revised Technical Revision Cover Sheet to include <br /> range land and recreation in the description. <br /> a. Exhibit F— Reclamation Plan Map includes descriptions of the final land use of the <br /> affected lands. <br />
The URL can be used to link to this page
Your browser does not support the video tag.