My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-17_REPORT - M1979045
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1979045
>
2017-02-17_REPORT - M1979045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 11:04:31 PM
Creation date
2/18/2017 12:01:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REPORT
Doc Date
2/17/2017
Doc Name
Annual Fee/Report/Map
From
Lakewood Brick & Tile
To
DRMS
Annual Report Year
2017
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee Name: Lakewood Brick and Tile Co. <br /> Permit No: M-1979-045 <br /> Operation Name: Church Pit <br /> Anniversary Date: 02/28/2017 <br /> Additional information <br /> 7. Total Disturbance 70.00 ac t <br /> Clay Approximately 42 .80 acres is disturbed. We continued to <br /> mine deeper into the clay vein this year(brown) and use the <br /> processing area (purple) . No new are was disturbed this <br /> year. <br /> Gravel Approximately 27.20 acres is disturbed, the plant site area <br /> (orange) , stockpile area and gravel is removed from the <br /> partially mined area north of the ditches (pink) . The <br /> material processed at the Plant Site came from gravel mined <br /> this year on the Rocky Flats Pit (M-1987-113) . Some waste <br /> rock was removed for use by the mineral owners from the pre- <br /> law stockpile areas and along the west side of the clay mine <br /> in Stage I. <br /> 8. Clay No new area was disturbed this year as we continue to mine <br /> the area stripped in previous years. The stone yard on the <br /> west side is still in use. <br /> Gravel Mining will continue to removed material between the Church <br /> Pit and the Rocky Flats Pit as approved in the permit. No <br /> sloping will be required along the permit boundaries on the <br /> east side of this mine. <br /> 9. No reclamation was required this year. The Pre-law stockpile areas <br /> that were disturbed have been graded so only resoiling and seeding <br /> will be needed when it is time for those areas to be seeded. <br /> Stockpiles of growth medium are located along the west and south <br /> sides of the permit area (pink) . The piles have been temporary <br /> seeded. <br /> 11. No reclamation is called for during the next year. However, <br /> backfilling may continue in the old clay pit area on the south end <br /> of the mine. If the opportunities to sell rock from the pre-law <br /> overburden piles occur, that removal will continue as well. <br /> 12 . Approximately 4 .55 acres on sections of the clay mine area have been <br /> backfilled over the life of the mine. The filled area is graded and <br /> used for working area in the Clay and Gravel Plant sites. <br /> 13 . Weeds were sprayed in 2016 for a total of 5 days. <br /> Areas sprayed: Roadways, disturbed areas and berms <br /> Dates: , May 21, 25, 27, 30, 31 & June 1 <br /> Chemical used and rates: Milestone - 6 oz/ac. ; Escort - 0 .6 <br /> oz/ac. ; Telar - 0.6 oz/ac. ; Telar - 0.6 oz/ac; marker dye - . 04 <br /> oz/ac; Surface AC90 - 0 .42 oz/ac. <br /> Species targeted: Diffused Knapweed, bindweed, mullein, Scotch <br /> thistle & Houndstongue, Kochia Canadian Thistle and Russian <br /> thistle. <br /> Success analysis: good, spraying will continue each year. <br /> 18 . The approved bond amount is $323, 800 and was reevaluated and <br /> increased on October 11, 2016 by the Division to this amount. <br /> Attached is the $791. 00 annual fee (Check # ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.