My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-17_REPORT - M1979045
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1979045
>
2017-02-17_REPORT - M1979045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 11:04:31 PM
Creation date
2/18/2017 12:01:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REPORT
Doc Date
2/17/2017
Doc Name
Annual Fee/Report/Map
From
Lakewood Brick & Tile
To
DRMS
Annual Report Year
2017
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 4.55 seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 4.55 fertilized w/ replacement rate(ions/ac): <br /> a vd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan'? YES XR XX <br /> If"YES", indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit'? YES XX <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES XX XX <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? "$ XX N/A <br /> 17. Arc all hazardous materials stored within approved spill containment structures'? YES XW XX <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES XX <br /> 19. Is your basis for legal right to enter still valid? YES )W <br /> 20. Does your permit require you to submit monitoring information annually'? XXX NO XX <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: YES <br /> Note: Additional information is provided on <br /> attached page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.