Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 6300 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Han] Rnnte. <br />Seg # <br />Scraper Push Dozer <br />Source <br />Altitude Ad': <br />1.000 NA <br />CAT HB <br />Job Efficiency: <br />0.830 NA <br />CAT HB <br />Site Altitude: 6300 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Han] Rnnte. <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />oda <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />4200.00 <br />-6.40 <br />4.00 <br />-2.40 <br />2972 <br />1.46 <br />Haul Time: 1.46 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />4200.00 <br />6.40 <br />4.00 <br />10.40 <br />1476 <br />2.90 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 583.89 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) <br />Unit cost: $1.549 /LCY <br />2.90 <br />minutes <br />5.96 <br />minutes <br />484.63 <br />LCY/Hour <br />2 <br />Scraper(s) <br />484.63 <br />LCY/Hour <br />484.63 <br />LCY/Hour <br />Total job time: 15.48 Hours <br />Total job cost: $11,617 <br />CIRCES Cost Estimating Software <br />