Laserfiche WebLink
Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.900 <br />CAT HB <br />1.200 <br />SLOT <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3412 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />104.27 LCY/hr <br />417.08 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $2.468/LCY <br />Total job time <br />Total job cost <br />0.16 Hours <br />$164 <br />CIRCES Cost Estimating Software <br />