Laserfiche WebLink
Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />AVG. <br />0.900 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3554 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />375.16 LCY/hr <br />1500.64 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.640/LCY <br />Total job time <br />Total job cost <br />0.80 Hours <br />$769 <br />CIRCES Cost Estimating Software <br />