Laserfiche WebLink
Superstructure <br />overland, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />-Bent foundations <br />l60x6x4 <br />Demo. and on- <br />3,840.00 <br />SF <br />$2.24 <br />$8,601.60 <br />site disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />-Micro piles <br />240x2x2 <br />Demo. and on- <br />960.00 <br />LF <br />$10.08 <br />$9,677.76 <br />site disposal in <br />excavated pit, 1.5 <br />ft. x 3 ft. - Max. <br />200 ft.push <br />-Take-up tower <br />24x2Ox80 <br />Bldg. (MN) <br />38,400.00 <br />CF <br />$0.23 <br />$8,832.00 <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />TC-1/PR-2 <br />20x2Ox4O <br />Bldg. (MN) <br />16,000.00 <br />CF <br />$0.23 <br />$3,680.00 <br />transfer structure <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Foundation <br />20x2Ox 12 in <br />Demo. and on- <br />400.00 <br />SF <br />$2.24 <br />$896.00 <br />site disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />P-6 conveyor <br />8x1Ox2001f <br />Conveyor, <br />200.00 <br />LF <br />$26.71 <br />$5,342.00 <br />overland, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />PP -4 conveyor <br />8x10x5501f <br />Conveyor, <br />550.00 <br />LF <br />$26.71 <br />$14,690.50 <br />overland, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />-Bent foundations <br />lOx2x4 <br />Demo. and on- <br />80.00 <br />SF <br />$2.24 <br />$179.20 <br />site disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />Shaft 3 exhaust <br />l20x2OxlO <br />Bldg. (SN) <br />24,000.00 <br />CF <br />$0.21 <br />$4,920.00 <br />fan (MR -337)- <br />demo./on-site <br />Superstructure <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Floor <br />130x3lx8 in <br />Demo. and on- <br />4,030.00 <br />SF <br />$1.49 <br />$6,020.82 <br />site disposal in <br />excavated pit, 8 <br />in. thick - Max. <br />200 ft.push <br />-Footings <br />2x3 <br />Demo. and on- <br />280.00 <br />LF <br />$13.44 <br />$3,763.76 <br />site disposal in <br />excavated pit, 2.0 <br />CIRCES Cost Estimating Software <br />