Laserfiche WebLink
CIRCES Cost Estimating Software <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft.push <br />Hazardous waste <br />20 <br />Hazardous waste <br />20.00 <br />DRUM <br />$356.82 <br />$7,136.40 <br />pick-up <br />removal - Drum <br />solids/liquids, per <br />drum, (7+ drum <br />job) <br />Hazardous waste <br />20 <br />Hazardous waste <br />20.00 <br />EA <br />$242.65 <br />$4,853.00 <br />sampling <br />sampling and <br />analysis, per <br />sample <br />Hazardous waste <br />20 <br />Solid transport, <br />300.00 <br />MI <br />$5.60 <br />$1,680.00 <br />transportation <br />large truck (max. <br />80 drums, 25 cy, <br />or 18 tons) - <br />Avera e <br />Hazardous waste <br />5 <br />Dumpsite <br />5.00 <br />TON <br />$277.50 <br />$1,387.50 <br />disposal <br />disposal charge - <br />Avera e <br />Barrel storage area <br />46x39xl6 <br />Bldg. (SN) <br />28,704.00 <br />CF <br />$0.21 <br />$5,884.32 <br />(expansion)- <br />demo./on-site <br />structure <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Floor <br />46X39 <br />Demo. and on- <br />1,794.00 <br />SF <br />$1.12 <br />$2,009.28 <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft.push <br />-Footers <br />1.5x3 <br />Demo. and on- <br />18.00 <br />LF <br />$10.08 <br />$181.46 <br />site disposal in <br />excavated pit, 1.5 <br />ft. x 3 ft. - Max. <br />200 ft.push <br />-Curbs, ramps, <br />13x13 (2) <br />Demo. and on- <br />338.00 <br />SF <br />$1.18 <br />$400.19 <br />sump wall and <br />site disposal in <br />sump pad <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft.push <br />-Fence <br />1241f <br />Fencing, chain <br />124.00 <br />LF <br />$3.05 <br />$378.20 <br />link, including <br />posts and fabric - <br />8 ft. to 10 ft. high <br />Hydraulic <br />18x25x45 <br />Bldg. (SN) <br />6,300.00 <br />CF <br />$0.21 <br />$1,291.50 <br />compressor <br />demo./on-site <br />building- Structure <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Floor <br />18x25 <br />Demo. and on- <br />450.00 <br />SF <br />$1.49 <br />$672.30 <br />site disposal in <br />excavated pit, 8 <br />in. thick - Max. <br />200 ft.push <br />-Footings <br />1 <br />Demo. and on- <br />86.00 <br />LF <br />$4.48 <br />$385.37 <br />site disposal in <br />excavated pit, 1.0 <br />ft. x 2 ft. - Max. <br />200 ft.push <br />Containment <br />34x4 <br />Demo. and on- <br />136.00 <br />SF <br />$1.58 <br />$214.61 <br />structure -walls, <br />site disposal in <br />CIRCES Cost Estimating Software <br />