Laserfiche WebLink
trap floors/walls <br />site disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />-Inlet sediment <br />36.7x14' <br />Demo. and on- <br />514.00 <br />SF <br />$2.24 <br />$1,151.36 <br />trap floors/walls <br />site disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />-Inlet sediment <br />36.7x14 <br />Demo. and on- <br />514.00 <br />SF <br />$2.24 <br />$1,151.36 <br />trap floors/walls <br />site disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />-Weir box <br />133 <br />Demo. and on- <br />133.00 <br />SF <br />$1.12 <br />$148.96 <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft.push <br />Pond MB -3 - <br />50x30x3 <br />Bldg. (SN) <br />4,500.00 <br />CF <br />$0.21 <br />$922.50 <br />Bridge <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Inlet sediment <br />36.7x7 <br />Demo. and on- <br />606.00 <br />SF <br />$2.24 <br />$1,357.44 <br />trap floors/walls <br />site disposal in <br />(1) <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />-Inlet sediment <br />36.7x14 <br />Demo. and on- <br />1,000.00 <br />SF <br />$2.24 <br />$2,240.00 <br />trap floors/walls <br />site disposal in <br />(2) <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />Pond FW -1 - <br />7.5x6.7x22 <br />Bldg. (SN) <br />1,106.00 <br />CF <br />$0.21 <br />$226.73 <br />Control tower <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Outlet structure <br />34 sf <br />Demo. and on- <br />34.00 <br />SF <br />$1.12 <br />$38.08 <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft.push <br />-Catwalk <br />5.3x4.7x5 <br />Bldg. (SN) <br />112.00 <br />CF <br />$0.21 <br />$22.96 <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Spillway cut-off <br />40x10 <br />Demo. and on- <br />400.00 <br />SF <br />$1.97 <br />$789.20 <br />wall <br />site disposal in <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft.push <br />-Principal spillway <br />601f <br />Pipe, corrugated <br />60.00 <br />LF <br />$1.74 <br />$104.40 <br />metal (CMP) - 8 <br />in. diameter pipe <br />Train loadout - <br />39x22x24 <br />Bldg. (MN) <br />20,592.00 <br />CF <br />$0.23 <br />$4,736.16 <br />Superstructure <br />demo./on-site <br />disposal in <br />CIRCES Cost Estimating Software <br />