Laserfiche WebLink
Roadside Mine <br />#00489-0004 Hudd�citnn-JJrrts <br />05/09/16 <br />Subsequent to the grouting around the shaft, HBET recommends that grout holes be installed <br />near the surface sinkhole openings. In general, the pathways that lead from the surface openings <br />to the air shaft should be identifiable during the grout hole drilling and/or grouting operations as <br />voids associated with the pathways will cause loss/reduction of air flush return and should also <br />take more grout than the surrounding, undisturbed soils. Additional holes should be installed as <br />necessary to `map' the pathways and ensure that the pathways from the ground surface to the <br />shaft are sealed. The compaction grouting program will likely be more expensive than the <br />excavation approach; however, this method will result in minimal surface disturbance. <br />General <br />The conclusions and recommendations above <br />available information, and upon our experience. <br />only for the subject project. <br />are based upon our observations at the site, <br />The conclusions and recommendations are valid <br />We are pleased to be of service to your project. Please contact us if you have any questions or <br />comments regarding the contents of this report. <br />Respectfully Submitted: <br />Huddleston -Berry Engineering and Testing, LLC <br />Michael A. Berry, P.E. <br />Vice President of Engineering <br />X 12008 ALL PROJECTSDN89 - JE Stover Associates InO00489-0004 Roadside Mux\200 - GcoW0489-0004 LRO50916 doc 4 <br />TR -69 A14-14-4 09/16 <br />