Laserfiche WebLink
TR -69 Figure 14-18 12/16 <br />Snowcap Coal Company <br />Figure 14-18 <br />Hydrologic Communication Repair Plan <br />Implementation and Reclamation Schedule <br />Start Date Unknown <br />Da <br />Work Item <br />1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 <br />Mobilization & Demobilization <br />Topsoil Salvage 325 cubicyards) <br />Excavation 1,100 cubicyards) <br />Inspection <br />Pour Concrete Cap Over Shaft 15 cubicyards) <br />Place and Compact Backfill 1,100 cubicyards) <br />Re lace Topsoil 325 cubicyards) <br />Seed and Mulch <br />TR -69 Figure 14-18 12/16 <br />