My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-15_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-02-15_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 6:57:50 AM
Creation date
2/16/2017 6:44:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
2/15/2017
Doc Name
Comments to Proposed Decision Approving Snowcap Repair Plan
From
James A Beckwith
To
DRMS
Type & Sequence
TR69
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The regraded surfaces will be ripped if necessary to relieve compaction and to provide <br />for root penetration. Topsoil will be placed and spread with either a front end loader or <br />track mounted backhoe. Handling topsoil in such a manner will minimize deterioration <br />of the biological, chemical, and physical properties of the topsoil and will prevent excess <br />compaction and contamination of the topsoil. Topsoil will not be handled when <br />saturated either during the initial stripping, spreading or final grading. Handling sticky <br />or plastic soils in a saturated state will reduce the quality of the topsoil by degrading the <br />physical characteristics. <br />After the topsoil is replaced, the areas will be seeded and mulched. Mulch will be <br />certified weed free grass hay or straw. SCC will use the approved Seed Mix listed on <br />Table 14-8 "Permanent Seed Mixture - Upland Components". <br />Quantities <br />The 0.4 acres of disturbance will require the salvage of approximately 325 cubic yards of <br />topsoil which represents a 6" depth. Excavation of the shaft area and the north NSA will <br />entail the excavation of 1,100 cubic yards. The concrete to seal shaft will take 15 cubic <br />yards. <br />TR -69 14-36 12/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.