My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-14_REPORT - M2011033
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2011033
>
2017-02-14_REPORT - M2011033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 6:42:29 PM
Creation date
2/15/2017 10:21:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011033
IBM Index Class Name
REPORT
Doc Date
2/14/2017
Doc Name
Annual Fee/Report/Map
From
Harry Corkle Const
To
DRMS
Annual Report Year
2017
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
earthitp <br /> qree <br /> ! . ' n <br /> �•�- 3400 West 16thner97t0^81d g853 uitF0 g70 587 9843 rado 80634 <br /> �taV�' �l Pho <br /> Date: August 5, 2016 Phone: <br /> Company: Corkle Construction Fax: <br /> Attn: Harry <br /> Project: Corkle Gravel Pit Quantity Unit Price Total <br /> Item Item Description 2.60 AC <br /> 1 Seedin Native-See Attached Mix 2,60 AC _ <br /> 2 CWF Local Ha 4000# er acre crim ed 2.00 EA <br /> 3 Lod(in /Perdium <br /> 4.00 HR <br /> 4 Mobilization <br /> Total: <br /> Note: Lodging and Perdium will be charged at 95.00 per man per day. <br /> ADD AL.T: Additional Mobilization Charges if multii,l4: location cannot l)e SI-'ll4Kill d to construct <br /> mG;ltiple location per each mobilization PER HR <br /> 1 AC $ <br /> ADD ALT: Local Hay I CWF 4000#PER ACRE 1 AC $ <br /> ADD ALT: Non Certified Straw 4000#per acre 1 AC $ <br /> ADD ALT: Hydro Mulch Wood Fiber 2000#per ac <br /> ADD ALT: FGM high performance Hydro Mulch 1 AC $ <br /> 2600#per acre 1 AC $ <br /> ADD ALT: Plantago Straw Tackifier 200#per acre 1 AC $ <br /> ADD ALT: Dozer Ripping if required 650 JD <br /> or Tackifier)Hydraulic FGM will require water.Water to be <br /> All Hylic applications (Hydro Mulch,Note: gallons per acre for FGM,4000 gallons per acre <br /> supplied on location by customers 1 ch <br /> for tackifier and s500 gallons per acre for Hydro Mulch ). <br /> Note: <br /> All areas are to be topsoiled by others,we assume a rock free and loose soil area to seed. <br /> Bond if required @ 2.50%additional <br /> sions- Traffic Control, Soil Import 1 Export I Placement, Maintenance, <br /> m is or Feeasenclguded n quote. <br /> 1/10" y <br /> to <br /> Excl u---- <br /> others.Access all areas on site to be provided.. Fertilizerpermits <br /> or maintenance included in quote. <br /> Exclus s: No rock pickingor debris removal. No soil rep. <br /> * Addendums Acknowleged: <br /> *This bid is good for thirty days from the bid date listed <br /> Bond.on thisquote. nt <br /> *This bid does not include a performance an payment <br /> information for this project. No warranty, <br /> *GEEI has not been provided any warranty or guarantee <br /> or guar <br /> antee is expressed or Implied. We will honor general workmanship standards. <br /> \\SERVE R\RedirectedFolders\Jim D\My Documents\Documents\sandridgenative seeding <br />
The URL can be used to link to this page
Your browser does not support the video tag.