Laserfiche WebLink
2010 Reclamation Activities: <br />There was no reclamation activities during this reporting period. <br />2009 Reclamation Activities: <br />During the reporting year 2009, Bowie completed final grading of the Bowie #1 East Mine <br />(excluding required sediment control structures). The 2009 reclamation activities, which was a <br />continuation of the 2008 activities, included the final grading and hydro seeding with an approved <br />permanent seed mix and mulched with wood fiber mulch at a rate of 2,000 lbs/acre of the following <br />areas. (See "2009 <br />Reclamation Map') <br />Zones <br />Description <br />Acreage <br />Ton soiled <br />Revelletated <br />Zone 4-C <br />Portal Bench <br />5.17 <br />2.89 <br />No <br />Zone 2-E <br />Substation/Access Road <br />0.18 <br />0.18 <br />No <br />Zone 2-D <br />Access Road <br />0.15 <br />0.00 <br />No <br />Zone 1-E <br />Belt Transfer <br />0.07 <br />0.07 <br />No <br />Zone 2-A <br />Shop/Warehouse <br />1.63 <br />1.63 <br />No <br />Zone 4-B <br />Storage Bench <br />1.17 <br />1.17 <br />1.17 <br />Zone 2-C <br />Access Road <br />0.44 <br />0.00 <br />No <br />Total <br />8.81 <br />5.94 <br />1.17 <br />T <br />14 <br />