Laserfiche WebLink
2008 Reclamation Activities: <br />During the reporting year 2008, Bowie Resources LLC continued with the partial reclamation <br />of the Bowie No. 1 East Mine. (The 2008 reclamation is a continuation of the 2001 activities in <br />which surface structures were removed.) The 2008 reclamation consisted of returning portions of <br />the disturbed area back to approximate original contours and hydro seeding with a permanent seed <br />mix and wood fiber mulch. The following zones were completed during the 2008 reporting period. <br />(Reference attached Drawings "Reclamation Zones East Mines and "ROM Coal Stockpile Area") <br />Zones <br />Description <br />Acreage <br />Top soiled <br />Reveaetated <br />Zone 1-A <br />Crushing & Screening Level Fill <br />Yes <br />Yes <br />2.64 <br />Zone 1-B <br />Shop & Warehouse Level Fill <br />Yes <br />Yes <br />3.08 <br />Zone 1-D <br />Substation Level Fill <br />Yes <br />Yes <br />0.36 <br />Zone 2-B <br />Portal Level Fill <br />No <br />No <br />Zone 3-A <br />Diversion Channel Cut <br />Yes <br />Yes <br />Zone 3-B <br />Diversion Channel Cut <br />Yes <br />Yes <br />Zone 3-C <br />Diversion Channel Cut <br />Yes <br />Yes <br />5.48 (Total) <br />Zone 4-A <br />Rock Cut above Crushing & Screening <br />Yes <br />Yes <br />2.64 <br />Zone 4-D <br />Rock Cut below Fan Level <br />No <br />Yes <br />3.50 <br />Zone 5-A <br />Waste Rock Disposal Site <br />Yes <br />No <br />0.82 <br />Zone 6-A <br />R.O.M. Coal Stockpile & Access Road <br />Yes <br />Yes <br />11.16 <br />Totals <br />29.82 <br />