Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> January 2017 Monthly Report <br /> Page 3 <br /> Table 2 January 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> feet Water ft <br /> P10 1/31/17 57.62 58.30 0.68 <br /> P11 1/31/17 41.38 41.80 0.42 <br /> P12 1/31/17 41.69 41.71 0.02 <br /> P13 1 1/31/17 40.99 41.34 1 0.35 <br /> P14 1/31/17 Dry 41.24 0.00 <br /> P15 1/31/17 40.85 41.10 0.25 <br /> Table 3 below provides the calendar year 2017 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> Sincerely, <br /> t <br /> Jklio F. Madrid <br /> Sr. Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />