Laserfiche WebLink
2016 AHR Page 5 <br />conducted for the Year. The monitoring wells associated with GWMS01 A&B, GWMS02 A&B, <br />and GWMS03 A&B were plugged and abandoned on August 24, 2016. A copy of the <br />abandonment report is attached. <br />Piezometers CRDA-01 thru 06 at the Cameo Refuse Disposal Areas (CRDA) No. 1 and No. 2 <br />were monitored the first quarter of the 2016 Water Year. Data page GC -25 includes <br />measurements for this Year. A graphical representation of the water level elevations in the <br />CRDA Piezometers is shown on Diagram G16-4. The water levels in CRDA-01 and CRDA-01A <br />were stable this Year. Piezometers CRDA-02, 03, 04, 05 and 06 have been damp to dry for the <br />past five years (2011 — 2015). The water levels in the PZ-# piezometers were all below their <br />critical depths. A graphical representation of the water levels in the nested piezometers is <br />shown on diagrams G16-7, 8, 9 and 10. The monitoring was suspended for these piezometers <br />with the approval of TR67 on February 23, 2016. The piezometers were removed and backfilled <br />in May 2016 as specified on page 14-31 of SCC's permit document. <br />The past results of water level measurements at the unit train loadout are listed on Data page <br />GB -2. Monitoring of these piezometers was discontinued with the approval of SL -7 in April <br />2011 and the UTL-01, UTL-02, UTL-03 and UTL-04 piezometers were sealed and reclaimed on <br />May 17, 2011. The Well Abandonment Reports were included in DRMS's quarterly report dated <br />July 7, 2011. No monitoring was performed during the Year. <br />A former mine dewatering hole (N-1) located at the North Decline area of the mine is used to <br />monitor the water level in the abandoned portions of the Roadside South Portal. Since <br />discharge point 016 was put into service, the water level in N-1 is virtually constant and it is <br />expected to stay at an elevation of about 4758. The results of monitoring N-1 are presented in <br />Table M16-2. <br />In order to characterize the Rollins Sandstone two surface and two underground wells were <br />installed during June 1997. The surface wells, Rollins -2 and Rollins -3, were installed at the unit <br />train loadout and the north decline respectively. The underground wells, Rollins -1 and Rollins -4, <br />were installed in the North and South Portals respectively. Depth to water ranged from 56.5 feet <br />below grade in the North Decline well to artesian in the North Portal well. Monitoring of these <br />wells was performed in accordance with permit requirements. Prior depth to water data is <br />presented on data page GE -1-1. Rollins -1 was sealed in December 1999 and Rollin -4 was <br />sealed in April 2000. Rollins -2 and 3, with the approval of SL -7, were sealed in May 2011. The <br />Well Abandonment Reports were included in DRMS's quarterly report dated July 7, 2011. No <br />monitoring was performed during the Year. <br />Mine Water <br />There was no annual mine inflow study performed this Year since one was performed during <br />December 1999 and reported in the 1999 report. Since the North and South Portals have been <br />sealed, there will not be any additional mine inflow studies. <br />