Laserfiche WebLink
Line work of lines owned by Encana as they traverse the west center of Tract B were inadvertently <br />left off of the original submittal maps and are now included. The configuration of the extraction <br />and reclamation maps %%ere adjusted to reflect the current placement of those Encana lines and are <br />not planned for relocation at this time that might have led to the prior configuration subsequent to <br />relocation of lines along the access road south of the Floodplain Relic area. <br />EXHIBIT F — Reclamation Ptim Ma <br />2. Please provide an alternative Reclamation Plan Map with the expected physical appearance of <br />Tract A — West Basin if a structure agreement to relocate the Anadarko oil and gas line is not <br />obtained and the oil and gas line easement cannot be mined through by the Ope3rator pursuant to <br />Rule 6.4.6(a). <br />Line work reflective of the AnadarkoJKerr-McGEE Right -of -Way for the Existing and Rerouted oil <br />and gas lines. The resulting slopes will remain at 3H:I V or flatter. <br />EXHIBIT R — Proof of Filing with County Clerk and recorder <br />3. Please provide an affidavit or receipt indicating the date on which the revised application <br />information required to address this adequacy letter was placed with the Weld County Cleric and <br />Recorder for public review, pursuant to Subparagraph 1.6.2(l)(c). <br />.Attached. <br />Attachments: <br />1) Proposed Anadarko./Kerr-McGEE Right of Way Survey — Exhibit A - line relocation. <br />2) Revised Maps. <br />• Exhibit C-1 A: Existing Conditions Map Revised 21 October 2016 <br />• Exhibit C-2: Extraction Plan Map — Existing Gas Line and ROW <br />• Exhibit C-2: Extraction. Plan- Map — Rerouted Gag Line and ROW <br />• Exhibit F Reclamation Pian — With Existing Anadarko Gas Line and ROW <br />• Exhibit F Reclamation Plan — With Rerouted Anadarko Gas Line and ROW <br />3) Proof of Placement — Weld County Clerk to the Board. <br />Varra Companies, Inc. OMLR 112 Permit Application M2015-033 2 <br />Parcel 122 — Resource Development Project Cafrrespondence of 24 October 2016 <br />