My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-23_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-12-23_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 8:28:09 AM
Creation date
2/13/2017 8:00:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/23/2016
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
With both Washplants I and II operating, the thickener underflow is typically a 15 to 25 percent solids, 300 to 550 <br />gpm slurry mixture of rock and coal fines (28 mesh x 0). Exhibit 9C, Underflow Chemical Characterization, <br />provides data on selected chemical constituents found in the thickener underflow. The water quality of the slurry is <br />consistent with that of typical spoils water generated at the adjacent CYCC surface mine. The slurry mixture is <br />piped to the sealed mine workings in the EMD, where the fines settle -out, and the decant water flows to a sump and <br />is recycled back to the washplants. At the full coal fines refuse discharge rate, approximately 1.6MM ft3 of coal <br />fines storage is required on an annual basis. The EMD has approximately 1 l OMM ft3 of coal fines storage capacity <br />remaining (approximately 70 -years capacity). In anticipation of future mining of the underlying Wolf Creek Coal <br />Seam, TC shifted underground coal fines slurry placement to sealed mine workings in the Southwest Mining <br />District (SWMD), which provides approximately 61 MM ft3 of coal fines storage capacity (approximately 30 -years <br />capacity). Map 23 shows the EMD and SWMD areas that have been or will be filled with fine refuse material. <br />With the addition of new thickener underflow boreholes at the 6RT, 7RT, 2MN, and SWMD locations, it will be <br />possible to pump the fine coal refuse slurry from the washplants through the 1MN/SWMD or the 2MN/6RT/7RT <br />pipelines to the corresponding boreholes. The 1 MN/SWMD pipeline consists of two 6 -inch HDPE pipelines <br />extending approximately 1,800 feet to an 8 -inch cased mine borehole, located near the former CYCC Mine Office <br />Building ("Brown Palace", see Map 24 for location of pipeline and borehole). The two Thickener Underflow <br />Pipelines replace the previously used 6 -inch PVC line from Washplant I, which was cut-off, capped, and abandoned <br />in-place. Tile approximately 7,700 foot SWMD pipeline will connect to the existing 1MN pipeline. The <br />6RT/7RT/2MN pipeline will extend approximately 9,600 feet to 7RT. All of the newer (installed subsequent to the <br />1 MN pipeline) pipeline installations will be a double HDPE pipe system in critical areas, with a 6 to 8 inch carrier <br />pipe inside a larger (maximum size - 12 -inch diameter) containment pipe. Electronic moisture sensors, along with <br />pump controls, and shut-off valves will provide for timely detection, shut-off, and isolation of the pipeline in the event <br />of pipeline leakage. Access/inspection manholes will be located at key points along the pipeline routes. The <br />pipelines will be buried at a depth of approximately 5 feet and traverse both previously disturbed and un -disturbed <br />areas. Installation of the thickener underflow pipelines typically involves: <br />• Placement of temporary BMP's for drainage and sediment control from pipeline and construction areas <br />• Removal and windrowing of soils materials from any new disturbance areas <br />• Excavation of the pipeline trench, with temporary placement of excavated material adjacent to the trench <br />• Excavation of boring/jacking pits on the edge of Haulroad B-2 and an existing drainage ditch on the north <br />side of the existing railroad spur (as shown on Figure 49K -FI) and boring/jacking of 24 -inch secondary <br />containment culvert under existing Foidel Creek road crossing culverts and railroad spur <br />• Bedding and placement of the thickener underflow pipelines (carrier and containment system) in the trench, <br />and installation of intermediate access/monitoring manhole(s) <br />• Installation of moisture sensors, and connection of the pipelines to the thickener underflow systems from <br />the Washplant I and II Thickeners, along with associated pump controls and shut-off valves, and pressure <br />testing of the pipeline <br />• Controlled backfilling and compaction of excavated material in the trench <br />• Surface grading, soil material replacement, seeding with TCC's temporary stabilization seed mixture, and <br />placement of temporary BMPs to control runoff and erosion until vegetation was reestablished for all <br />project disturbance areas <br />The thickener underflow borehole surface casings extend approximately 4 feet above grade, and are capped and <br />locked. The borehole casing extends approximately 310 feet into sealed and abandoned mine workings into 1MN, <br />750 to 850 feet into the SWMD, and 510 feet into 6RT, 850 feet into 7RT, and 150 feet into 2MN, discharging on <br />the mine floor, where the fines settle -out and the decant drains to the decant sumps, where submersible pumps <br />recycle the water back to the surface. <br />The water is retained by coal barriers, as shown on the underground mine workings map. The barriers for the <br />refuse storage areas are minimum 250 -foot wide coal barriers between the EMD and the Northern Mining District, <br />and the SWMD and the Western Mining District, respectively. These barriers currently retain accumulated water <br />from mine inflows and contain a submersible pumps at the low points for mine dewatering. These pumps will be <br />used to recycle water back to the surface for washplant make-up water or underground for dust suppression, or the <br />TR16-86 2.05-97.7 09/02/16 <br />