Laserfiche WebLink
Approximately 75 cubic yards of road base and 300 cubic yards of spoil material were placed as cover for the <br />culvert extensions and rock check dams were placed across the new extensions, on the east and west sides of the <br />crossing. The actual road crossing remains in its original location over the original culvert location. A 12 -inch <br />mininnun diameter pipe was installed dw-1110 <br />MR 16- 301 2.05-68.1 07/08/16 <br />