My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-23_PERMIT FILE - C1982056A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2016-12-23_PERMIT FILE - C1982056A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 8:14:25 AM
Creation date
2/13/2017 7:54:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/23/2016
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD (Panels 17-Right through 24-Right,PR03-06 and PR06-07) <br /> The same mining method utilized in the southern half of the NMD will be used to extract coal from the northern <br /> half of this area. Existing surface facilities, including the EMD ventilation site, and 18-Right and 6-Main North <br /> Ventilation Shafts and associated support facilities, will be used for mining of coal in this part of the NMD permit <br /> area. <br /> WMD (Panels 12- through 17-Left, 13- and 14-Left Inby, and 19- through 20-Left,PR06-07,PR09-08,TR07- <br /> 63,TR08-64,TR09-68,TR09-71) <br /> Tile same mining method utilized in the NMD will be used to extract coal from the WMD. The existing surface <br /> facilities, including the 6-Main North Ventilation Shaft and associated support facilities, along with the new 18-Left <br /> Ventilation Installation, will be used for mining of coal in this part of the WMD permit area. <br /> WCR (Rock-Slope Access, Development and Mining of Panels WC-411T through WC-911T, and Internal <br /> Ventilation and Utility Shaft,TR13-83,PRI 5-11) <br /> The same mining methods and equipment utilized in the WMD will be used to extract coal from the WCR. The <br /> planned internal shaft will be developed using raise-bore or conventional sink methods. The existing surface <br /> facilities, including the NWM Ventilation Shaft, 6-Main North Ventilation Shaft and associated support facilities, <br /> and existing mine dewatering systems, will be used for mining of coal in the WCR. <br /> (2.) Operation Description <br /> (a) Surface mining. A detailed narrative description and appropriate map(s) prepared in <br /> accordance with 2.10 describing the land to be affected within the permit area accordingto o the proposed sequence <br /> of mining and reclamation Each narrative and/or map shall include a detailed timetable sufficient to describe the <br /> various mining phases proposed by the applicant the maximum acreage proposed for each phase of the operations <br /> within the permit area must be specified. <br /> RESPONSE <br /> No surface mining is planned in this application. Therefore, the requirements of this Section are not applicable to <br /> either the Foidel Creek operation or the Fish Creek Tipple operation <br /> (b) Underground mining. A detailed narrative and appropriate map(s) prepared according to the standards <br /> of 2 10 sufficient to describe all proposed surface disturbances to be associated with the underground <br /> mining activities within the permit area Each operation plan shall include a narrative cross-sections <br /> map(s) and timetables) sufficient to describe the areal extent of the proposed underground workings <br /> and the stratum to be affected. <br /> RESPONSE <br /> The mine portals are located in the NE'/4NE'/4 Section 32, T5N, R86W, Routt County, Colorado. Currently, these <br /> portals are the primary access to the mine for men and materials, utility services, and ventilation. Additionally, <br /> another portal was driven northeast of the original portals, as shown on Map 23, Mine Plan. This portal provides <br /> supplemental access for men, equipment, and supplies into the mine. Other openings into the mine include: <br /> • Zero-Entry Fan <br /> • Fresh Water Borehole <br /> • Thickener Underflow Boreholes (1 MN, 6RT, 7RT, and 2MN) <br /> • Rock-Dust Borehole <br /> • Fish Creek l and 2 Dewatering Boreholes and Ventilation Shaft <br /> • Barricade Chamber Access Escape Shaft <br /> • 10-Right Dewatering Boreholes 1 and 2 <br /> • Substation No. 11 Power-Drop Borehole <br /> TRl 6-86 2.05-11.1 09/02/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.