My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-09_PERMIT FILE - M2017002
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017002
>
2017-02-09_PERMIT FILE - M2017002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 11:17:37 AM
Creation date
2/10/2017 2:01:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017002
IBM Index Class Name
PERMIT FILE
Doc Date
2/9/2017
Doc Name
Application
From
Ames Construction, Inc.
To
DRMS
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Maps&Exhibits: Submit two(2)complete,unbound copies of the following application exhibits: <br /> 6.3.1 EXHIBIT A-Legal Description and Location Map <br /> 6.3.2 EXHIBIT B- Site Description <br /> 6.3.2 EXHIBIT C-Mining Plan <br /> 6.3.4 EXHIBIT D-Reclamation Plan <br /> 6.3.5 EXHIBIT E-Maps,to include the location of any recorded easements <br /> 6.3.6 EXHIBIT F-List of Other Permits and Licenses Required <br /> 6.3.7 EXHIBIT G- Source of Legal Right-to-Enter <br /> 6.3.8 EXHIBIT H-Municipalities Within a Two-mile Radius <br /> 6.3.9 EXHIBIT I-Proof of Filing with County Clerk <br /> 6.3.10 EXHIBIT J-Proof of Mailing Notices of Permit Application <br /> 6.3.11 EXHIBIT K-Terms of Governmental Contract <br /> 6.3.12 EXHIBIT L-Permanent Man-made Structures <br /> 1.6.2(1)(b) ADDENDUM 1 -Notice Requirements <br /> 6.5 Geotechnical Stability Exhibit(as required) <br /> Responsibilities as a Permittee: <br /> Upon application approval and permit issuance,this application becomes a legally binding document. Therefore,there are a number of <br /> important requirements which you,as a permittee,should fully understand. These requirements are listed below. Please read and initial <br /> each requirement,in the space provided,to acknowledge that you understand your obligations. If you do not understand these obligations <br /> the lease contact this Office for a full explanation. <br /> 1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume legal liability for <br /> all reasonable expenses which the Board or the Office may incur to reclaim the affected lands associated with your mining <br /> operation in the event your permit is revoked and financial warranty is forfeited; <br /> 2. The Board may suspend or revoke this permit,or assess a civil penalty,upon a finding that the permittee violated the <br /> terms or conditions of this permit,the Act,the Mineral Rules and Regulations,or that information contained in the application or <br /> your permit misrepresent important material facts; <br /> 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br /> substantial civil penalties,to you as permittee can result; <br /> 4. Any modification to the approved mining and reclamation plan from those described in your approved application <br /> requires you to submit a new permit application and obtain approval from the Board or Office; <br /> 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br /> 6. Upon permit issuance and prior to beginning on-site mining activity,you must post a sign at the entrance of the mine site, <br /> which shall be clearly visible from the access road,with the following information(Rule 3.1.12): <br /> a. the name of the operator; <br /> b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br /> Reclamation Board;and, <br /> C. the permit number. <br />
The URL can be used to link to this page
Your browser does not support the video tag.