My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-08_REPORT - M1983194
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983194
>
2017-02-08_REPORT - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 9:09:39 AM
Creation date
2/10/2017 10:49:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REPORT
Doc Date
2/8/2017
Doc Name
Annual Fee/Report/Map
From
Natural Soda, LLC
To
DRMS
Annual Report Year
2017
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AA Natural Soda LLC 2016 Project Status Report & Annual Plan of Development <br /> ' 4.1.4 Wells Associated With the NS Project (Confidential) <br /> The following well-field related activities occurred in 2016: Refer to Figure 3 & Figure 4 <br /> Plant and Well Location Map. <br /> • The 15H production well pair was drilled and completed in August 2016, and began <br /> ' producing in October 2016. Routine Mechanical Integrity Tests (MIT) Parts I & II <br /> were completed pursuant to UIC stipulations. <br /> ' • The 15H-SSMW was drilled as a vertical subsurface subsidence monitor well to <br /> provide long term subsurface subsidence monitoring during the production of the 15H <br /> production well pair and the planned 16H production well pair. <br /> i • The DS-4 monitor well was converted to a B-Groove monitor well and was renamed <br /> BG-8. <br /> • NS installed a liner hanger and screen filter in the 14H-R well between March 16th <br /> and the 17th. A larger P270 pump, capable of 850 GPM was also installed in the <br /> 14H-R well during this operation. <br /> • NS installed a liner hanger and screen filter in the 12H-R well between July 17th and <br /> the 18th. <br /> ' • NS installed a liner hanger and screen filter in the 13H-R well between July 26th and <br /> the 27th. <br /> • Routine Mechanical Integrity Tests (MIT) Parts I & II were completed in the DVPW <br /> casings in August 2016. <br /> • In September the 11 H recovery pump malfunctioned due to a scaling issue. The <br /> pump was pulled, and a new pump was installed which will allow the well to continue <br /> flow recovery operations. <br /> • The DS-6 ground water monitoring well was equipped with a nitrogen lift sampling <br /> pump in September. <br /> • In October the 7H-1 V recovery pump was removed, ending production on the retired <br /> ' 7H mining interval (last produced from during August 2015). <br /> • The BG-8, and DS-7 ground water monitoring wells were equipped with nitrogen lift <br /> sampling pumps in September and October. <br /> ' The current status of all wells associated with the NS Project is indicated in Table 3: List <br /> and Status of Wells Associated with NS. <br /> 1 4.1.5 Other Activities <br /> Continuous monitoring of proximal IDS aquifer monitor wells provided data for the <br /> management of active production mining interval operations. Throughout the year, <br /> injection and recovery rates were adjusted to maintain monitoring well water levels near <br /> target zones. <br /> ' DAUB&ASSOCIATES, INC. , ,, 13 January 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.