My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-03_GENERAL DOCUMENTS - C1980004
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980004
>
2017-02-03_GENERAL DOCUMENTS - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 6:42:45 AM
Creation date
2/9/2017 6:40:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
2/3/2017
Doc Name
Proposed Decision and Findings (PR2)
From
DRMS
To
McClane Canyon Mining, LLC
Permit Index Doc Type
Findings
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE DIVISION ONLY FOR SUCH PERIOD OF TIME THAT THE OPERATION IS UNDER A <br />DIVISION APPROVED TEMPORARY CESSATION OF OPERATIONS AND NO <br />ADDITIONAL DISTURBANCES ARE CREATED <br />Status: This stipulation was satisfied and terminated on January 29, 1992. <br />Stipulation No. 5 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE THE APPLICANT MUST PROVIDE AN <br />ADDITIONAL ANALYSIS OF THE FILL AND ANY OTHER DISTURBED MATERIAL <br />WHICH WILL NOT BE TOPSOILED PRIOR TO REVEGETATION. THIS SHALL CONSIST <br />OF A SINGLE COMPOSITE SAMPLE OF THE SURFICIAL 6 INCHES OF MATERIAL <br />TAKEN FORM SEVERAL LOCATIONS ON THE BENCH. THE SAMPLE SHALL BE <br />ANALYZED, AT A MINIMUM, FOR pH, ELECTRICAL CONDUCTIVITY AND SODIUM <br />ADSORPTION RATIO. IF THE ANALYSIS INDICATES THAT THE MATERIAL IS NOT <br />SUITABLE AS PLANT GROWTH MEDIUM, THE APPLICANT SHALL REVISE THE <br />PERMIT APPLICATION TO PROVIDE AN APPROVABLE PLAN FOR SELECTIVE <br />HANDLING AND ISOLATION OF THE UNSUITABLE MATERIAL DURING REGRADING <br />OPERATIONS. THE PLAN SHALL BE SUBMITTED TO THE DIVISION WITHIN 60 DAYS <br />FOLLOWING SUBMITTAL OF THE FILL MATERIAL ANALYSIS. <br />Status: This stipulation was satisfied and terminated on January 9, 1987. <br />Stipulation No. 6 <br />TOPSOIL MUST BE ANALYZED FOR FERTILIZER ELEMENTS (N,P,K) PRIOR TO <br />SEEDING. IF THE SOIL IS FOUND TO BE PROSPHOROUS DEFICIENT, PHOSPHOROUS <br />MUST BE INCORPORATED INTO THE TOPSOIL DURING THE RESPREADING PROCESS. <br />ANY OTHER FERTILIZER ELEMENTS WHICH ARE DEFICIENT IN THE TOPSOIL SHALL <br />BE ADDED AFTER ONE YEARS GROWTH OF VEGETATION AT A TIME OF YEAR <br />APPROVED BY THE DIVISION. <br />Status: This stipulation was satisfied and terminated on January 29, 1992. <br />Stipulation No. 7 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST REVISE <br />THEAPPLICATION TO PROVIDE A STATEMENT THAT THE COMBINED MCCLANE <br />CANYONMINE AND MUNGER CANYON MINE PRE -MINE DATA FOR PRODUCTIVITY <br />FOR THE GREASEWOOD SHRUBLAND, SHADSCALE SHRUBLAND, AND JUNIPER <br />WOODLAND PLANT COMMUNITIES WILL BE UTILIZED FOR THE DETERMINATION <br />OF REVEGETATION SUCCESS (PRODUCTIVITY COMPONENT) IN ACCORDANCE WITH <br />THE CRITERIA ESTABLISHED UNDER RULE 4.15.8(3)(b). <br />Status: This stipulation was satisfied and terminated on January 9, 1987. <br />Stipulation No. 8 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.