My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-08_REPORT - M1977223
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977223
>
2017-02-08_REPORT - M1977223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 9:01:21 AM
Creation date
2/8/2017 12:31:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REPORT
Doc Date
2/8/2017
Doc Name
Annual Fee/Report/Map
From
Five Rivers Ranch Cattle Feeding LLC
To
DRMS
Annual Report Year
2017
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres seeded top Total acres <br /> backfilled: 0 acres seeded w/ w/ta soil soil In mulched w/ <br /> —26 acres P 0 acres <br /> a previous roved mix: replaced: ears ap roved mulch: <br /> Total acres Total acres Topsoil TBD Mulch application TaD <br /> graded: 31 acres fertilized w/ 0 acres replacement (1-6 in. rate(tons/ac): (2 tons/ac <br /> a vd fertilizer: depth(in.): per plan) per plan) <br /> Seed s per DRMS Plan fertilizer Mulch As per DRMS Plan <br /> application drill with agitator total application As per DRMS Plan application (as required:straw or grass <br /> eeds per square ft=74.10 hay at a rate of 4,000 lbs/ac) <br /> method: P q method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? ES NO NIA <br /> If"YES",indicate the weed species, control area,control type,application rate and treatment on the report map. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? G <br /> NO N/A <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? G <br /> NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office oft tate <br /> Engineer(Well Pennit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO U/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO G <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? E NO N/A <br /> 19. 1s your basis for legal right to enter still valid? ES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-1 16 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: x <br />
The URL can be used to link to this page
Your browser does not support the video tag.