My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-07_REPORT - C2009087
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2017-02-07_REPORT - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2017 8:24:55 AM
Creation date
2/8/2017 6:56:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Report
Doc Date
2/7/2017
Doc Name
Annual Reclamation Report
From
Peabody Sage Creek Mining, LLC
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Annual Reclamation Report
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
permanent program lands that had received Phase I/II bond release under SL -01, SL03, SL -04, and SL - <br />05 for the Seneca II Mine. The SL -03 Phase III bond release was approved for 1,026 acres in May <br />2015. During the latter part of 2016, PSCM prepared an additional Phase III bond release application <br />as SL -04, covering approximately 422 acres of reclaimed lands, and submitted the application in mid- <br />January 2017. The CDRMS is currently reviewing the SL -04 application. The following table <br />summarizes the remaining reclamation liability acreages. <br />2016 DISTURBANCE AREA <br />In 2016, no additional acres were permitted to be disturbed, and no new disturbance occurred. The <br />annual disturbance status is reflected on the CDRMS Annual Report Form and is further described in <br />the text of this report. Refer to the 2016 Annual Report maps for the extent and status of the existing <br />mine disturbance. <br />During 2016, approximately 60,000 tons of coal that had been stockpiled on-site from the initial mine <br />development work, was recovered and transported to the Foidel Creek Mine for processing, loading, <br />and transport to coal, customers. Other site activities during 2016 included ongoing mine dewatering, <br />transport to the Mine of salvaged conveyor structure and mechanical components from the Williams <br />Fork Mines for storage and potential future use, and minor repairs to Pond 004 to address concerns <br />identified during the May 2016 CDRMS inspection. The pond repairs involved removal of a <br />deteriorated riser structure and outlet culvert, and reconstruction of the area of the pond embankment <br />where the outlet culvert was removed. Heavy livestock use of the pond was resulting in gradual <br />deterioration of the pond banks and decline of protective vegetative cover, so PSCM worked with our <br />grazing leasee, who developed the adjacent spring and installed a stock tank to shift livestock watering <br />use away from the pond. Both the pond repair areas and the area affected by development of the <br />spring were re -seeded to stabilize these minor re -disturbed areas. <br />BACKFILLING AND GRADING <br />In 2016. no new areas were backfilled or graded. <br />2016 ARR 1 <br />REM <br />PHASE I <br />PHASE II PHASE III <br />FULL BOND <br />REF. <br />REMAINING <br />REMAINING REMAINING <br />RELEASE <br />PRE -LAW AREAS <br />SL -02 SC <br />0 <br />0 1 <br />0 <br />68.8 <br />INTERIM/PERMANENT PROGRAM AREAS <br />SL- <br />S 1 /03/04 <br />SII <br />680.4 (-422 pending <br />1,026.0 (+422 <br />SL -01/03 <br />50.2 <br />99.0 <br />release) <br />pending release) <br />Sc <br />SL -04 SC <br />NEW PERMANENT PROGRAM AREAS <br />68.8 <br />68.8 <br />68.8 <br />0.0 <br />TOTALS <br />119.0 <br />167.8 <br />749.2 <br />1,094.8 <br />2016 DISTURBANCE AREA <br />In 2016, no additional acres were permitted to be disturbed, and no new disturbance occurred. The <br />annual disturbance status is reflected on the CDRMS Annual Report Form and is further described in <br />the text of this report. Refer to the 2016 Annual Report maps for the extent and status of the existing <br />mine disturbance. <br />During 2016, approximately 60,000 tons of coal that had been stockpiled on-site from the initial mine <br />development work, was recovered and transported to the Foidel Creek Mine for processing, loading, <br />and transport to coal, customers. Other site activities during 2016 included ongoing mine dewatering, <br />transport to the Mine of salvaged conveyor structure and mechanical components from the Williams <br />Fork Mines for storage and potential future use, and minor repairs to Pond 004 to address concerns <br />identified during the May 2016 CDRMS inspection. The pond repairs involved removal of a <br />deteriorated riser structure and outlet culvert, and reconstruction of the area of the pond embankment <br />where the outlet culvert was removed. Heavy livestock use of the pond was resulting in gradual <br />deterioration of the pond banks and decline of protective vegetative cover, so PSCM worked with our <br />grazing leasee, who developed the adjacent spring and installed a stock tank to shift livestock watering <br />use away from the pond. Both the pond repair areas and the area affected by development of the <br />spring were re -seeded to stabilize these minor re -disturbed areas. <br />BACKFILLING AND GRADING <br />In 2016. no new areas were backfilled or graded. <br />2016 ARR 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.