Laserfiche WebLink
EXHIBIT D <br /> RECLAMATION PLAN <br /> (1) Reclamation of the final mined areas will be initiated within 12 months of the <br /> permanent cessation of mining activities and is anticipated to be completed within <br /> 12 months of the start date. <br /> (1)(a) All upper soil horizons to be used in reconstructing the soil shall be removed from <br /> the immediate area before mining. The upper soil horizon shall be removed for <br /> use as surface soil on disturbed areas. If the upper soil horizon is less than 6 <br /> inches thick, enough material other than bedrock immediately below the upper <br /> horizon can be removed and used to obtain this thickness. Overburden <br /> replacement will begin after 1-2 acres have been mined, and continue the same <br /> throughout the mining operation. <br /> (1)(b) Areas will be sloped to a 3:1 ratio slope or flatter. Slopes will be compatible with <br /> the configuration of surrounding conditions and land use. <br /> (1)(c)(i) Based on the types of soils involved in the pit location the plant growth medium <br /> to be replaced should be in such a way as to establish an effective and long-lasting <br /> vegetative cover that is capable of self-regeneration without continued <br /> dependence on irrigation, soil amendments or fertilizer and equal to the natural <br /> vegetation of rangeland. Significant factors such as temperature, water and stress <br /> management will determine the plant growth. Based on the soil types in this pit <br /> location,the soils are sandy loam in the upper part, are sandy clay loam in the <br /> next part, and are underlain by sand and gravel at a depth of 12 to 20 inches. So at <br /> a minimum,this depth will be the thickness of plant growth medium to be <br /> replaced. <br /> (1)(c)(ii) Topsoil should be replaced when mining operations are completed. Before <br /> spreading the topsoil, the re-graded area should be scarified or ripped to prevent <br /> slippage surfaces and to promote root penetration. <br /> The rate of fertilizer application will be 40 pounds of nitrogen(N) and 40 pounds <br /> of phosphate (P205)per acre or as a laboratory soil analysis indicates is needed. <br /> Animal manure or similar organic material may be used to supply all or part of <br /> the specified nutrients. <br /> Time of application shall be immediately prior to seeding, at the time of seeding, <br /> or immediately following seeding, as applicable to the kind of fertilizer and the <br /> type of equipment used. <br /> The seedbed shall be well settled and firm,but friable enough that seed can be <br /> placed at appropriate depths. The seedbed shall be reasonably free of weeds. <br />