Laserfiche WebLink
Name of Addressee <br />Page 4 <br />Date <br />(2) Location — Light use roads have been designed and placed in areas that are of most <br />stability. Discussions regarding sediment control and minimization of sedimentation and <br />flood have been addressed. <br />(3) Design and Construction — NHN light use roads are to be field engineered to follow <br />requirement criteria as per Rule 4.03.3. <br />(4) Drainage — Drainage for haul roads are discussed under the haul road section of NH's <br />PAP starting on page 12. <br />(5) Surfacing — Surfacing discussion is included in the light use road section beginning on <br />page 12 in Section 2.05.3(3). <br />(6) Maintenance - Maintenance discussion is included in the light use road section beginning <br />on page 12 in Section 2.05.3(3). <br />(7) Reclamation — Reclamation discussion is included in the light use road section beginning <br />on Page 12 in Section 2.05.3(3). <br />All topics and discussions required under Rules 4.03.3(1)-(5) have been met in NHN's PAP. I <br />have no adequacy questions regarding the above mentioned Rule. <br />This concludes my review of the above mentioned sections for the New Horizon North Mine's <br />PAP for the Renewal No. 1 review. If you have any questions, feel free to contact me. <br />Sincerely, <br />Zach T. Trujillo <br />Environmental Protection Specialist <br />C -MR -13 <br />