My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-02_ENFORCEMENT - M1977057
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977057
>
2017-02-02_ENFORCEMENT - M1977057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 7:01:21 PM
Creation date
2/7/2017 8:15:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977057
IBM Index Class Name
ENFORCEMENT
Doc Date
2/2/2017
Doc Name
Board (MLRB) Order
From
DRMS
To
Pioneers Sand Company, Inc.
Violation No.
MV-2017-002
Email Name
ACY
GRM
AJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. On November 22, 2016,the Operator admitted the violation and agreed to <br /> the Division's recommendations to the Board. <br /> CONCLUSIONS OF LAW <br /> 7. The Board has jurisdiction aver this matter pursuant to the Colorado.Land <br /> Reclamation Act for the Extraction of Construction Materials,Article 32.5 of Title 34, C.R.S. <br /> (2016). <br /> 8. The material that the Operator extracted or developed at the site constitutes <br /> a"construction material"as that term is defined in section 34-32.5-103(3),C.R.S. <br /> 9. Section 34-32.5-109(1),C.R.S provides that"before engaging in a new <br /> operation,an operator shall first obtain from the board or office a reclamation permit." By <br /> disturbing 5.44 acres of land beyond the approved permit boundary,the Operator engaged <br /> in a new operation without first obtaining a permit, in violation of section 34-32.5-109(1), <br /> C.RS. <br /> 10. Pursuant to section 34-32.5-123(1),C.R.S.,the Board may issue a cease and <br /> desist order when it finds that an operator has failed to obtain a valid permit. <br /> 11. The Board may impose a civil penalty of not less than $1,000 per day or more <br /> than$5,000 per day for each day during which a violation occurs. C.R.S.§ 34-32.5-123(2) <br /> (2016). Here,the Board may impose a penalty based on thirty-seven (37) days of violation <br /> (from the November 8, 2016 Reason to Believe letter to the December 15,2016 nearing) at <br /> $1,000 to$5,000 per day for a civil penalty of$37,000 to$185,000. <br /> ORDER <br /> Based on the foregoing findings of fact and conclusions of law, the Board finds the <br /> Operator in violation of section 34-32.5-109(1), C.R.S. for failure to obtain from the board <br /> or office a reclamation permit prior to engaging in a new operation. <br /> The Operator shall CEASE AND DESIST any additional disturbances outside of the <br /> existing operations footprint until all required corrective actions are completed. <br /> The Board imposes against the Operator the following CORRECTIVE ACTION: the <br /> Operator shall submit a Conversion Application to modify the permit/affected area to <br /> incorporate the entire disturbed area. The Operator shall,within one hundred and eighty <br /> (180)days of the effective date of this Order,obtain an approved Conversion Application <br /> Permit. <br /> The Board imposes a CIVIL PENALTY for thirty-seven (37) days of violation at <br /> $1,000 per day for a total civil penalty of$37,000. All but$500 of the penalty is suspended <br /> if the Operator complies with this Order within the time specified. The portion of the civil <br /> Pioneer Sand Company,Inc. <br /> M-1977-057 <br /> MV-2017-002 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.