Laserfiche WebLink
February 1, 2017 <br />RECEIVED <br />Via USPS Tracking Number: 9590 9402 2003 6123 7719 63 <br />Mr. Peter Hays FEB 0 6 2017 <br />State of Colorado <br />Division of Reclamation, Mining & Safety I IVI W) RECLAMATION <br />MINIM' <br />1313 Sherman Street, Room 215 AND SAFETY <br />Denver, CO 80203 <br />Re: Updated SPCC Plan Submittal, Henderson Mine, Permit No. M-1977-342 <br />Mr. Hays: <br />Climax Molybdenum Company (CMC) is submitting the enclosed Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan for the Henderson Mine in compliance with the CMC, Henderson <br />Operations Environmental Protection Plan (EPP), TR -118. An Emergency Response Plan is required as a <br />component of the EPP for compliance with Sections 34-32-103 (4.9) and 34-32-116.5 (5), C.R.S 1984 <br />and Section 8.3 of the Mineral Rules and Regulations of the Colorado Mined Land Reclamation Board for <br />Hard Rock, Metal and Designated Mining Operation (Rules) for designated chemicals. Enclosed is an <br />electronic version of the plan. Note the Incident Response Manual (IRM) is included as an attachment to <br />the SPCC Plan. <br />If you have any additional questions or concerns, please feel free to contact me at (720) 942-3480 or <br />Miguel Hamarat at (720) 942-3255. <br />Sincerely, <br />Amber Parmet <br />Environmental Engineer II <br />Climax Molybdenum Company <br />Henderson Operations <br />Enclosures: <br />1. Henderson Mine SPCC Plan (CD) <br />cc (via email): <br />M. Hamarat, Climax <br />T. Haynes, Climax <br />W. Koester, Climax <br />A. Ungers, Climax <br />COLORADO <br />Climax 11 /lol ybde gum <br />He dP r onnO.oMinee <br />® <br />68 <br />A Freeport-McMoRan Company <br />p p y <br />Empire, CO 80438 <br />Phone (303) 569-3221 <br />Fax (303) 569-2830 <br />February 1, 2017 <br />RECEIVED <br />Via USPS Tracking Number: 9590 9402 2003 6123 7719 63 <br />Mr. Peter Hays FEB 0 6 2017 <br />State of Colorado <br />Division of Reclamation, Mining & Safety I IVI W) RECLAMATION <br />MINIM' <br />1313 Sherman Street, Room 215 AND SAFETY <br />Denver, CO 80203 <br />Re: Updated SPCC Plan Submittal, Henderson Mine, Permit No. M-1977-342 <br />Mr. Hays: <br />Climax Molybdenum Company (CMC) is submitting the enclosed Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan for the Henderson Mine in compliance with the CMC, Henderson <br />Operations Environmental Protection Plan (EPP), TR -118. An Emergency Response Plan is required as a <br />component of the EPP for compliance with Sections 34-32-103 (4.9) and 34-32-116.5 (5), C.R.S 1984 <br />and Section 8.3 of the Mineral Rules and Regulations of the Colorado Mined Land Reclamation Board for <br />Hard Rock, Metal and Designated Mining Operation (Rules) for designated chemicals. Enclosed is an <br />electronic version of the plan. Note the Incident Response Manual (IRM) is included as an attachment to <br />the SPCC Plan. <br />If you have any additional questions or concerns, please feel free to contact me at (720) 942-3480 or <br />Miguel Hamarat at (720) 942-3255. <br />Sincerely, <br />Amber Parmet <br />Environmental Engineer II <br />Climax Molybdenum Company <br />Henderson Operations <br />Enclosures: <br />1. Henderson Mine SPCC Plan (CD) <br />cc (via email): <br />M. Hamarat, Climax <br />T. Haynes, Climax <br />W. Koester, Climax <br />A. Ungers, Climax <br />