Laserfiche WebLink
1.0 EXTRACTIVE LAND USE—NARRATIVE <br /> 1.1 General Proiect Concepts <br /> Paragraph 3 <br /> The special use permit for this site shall be valid until July 31, 2032. At least one year prior to <br /> July 31, 2032 Denver Brick Company may apply for another USR extension. <br /> Paragraph 4 <br /> Mining will progress from the east to the west.Total disturbed acreage will be <br /> approximately 20.8 acres. Please see attached Colorado Division of Reclamation, Mining and <br /> Safety documents. <br /> 1.10 Impacts on Air and Water Quality <br /> Any necessary mitigation measures will include: <br /> Paragraph 2 <br /> All clay stockpiles will be compacted with a dozer to minimize erosion and airborne dust. <br /> Water from the detention pond will be utilized for dust mitigation on the haul road and <br /> disturbed areas. <br /> 1.15 Property Owner and Agents <br /> Property Owner: Acme Services Company LP ETAL <br /> P.O. Box 1750 <br /> Fort Worth, TX 76101-1750 <br /> Mine Operator: Denver Brick Company <br /> 401 Prairie Hawk Drive <br /> Castle Rock, CO 80109 <br /> Attn: Steve Helzer—Plant Manager <br /> 303-688-6951 <br /> 1.4.6 Visual Analysis <br /> Visual impact is not expected to be an issue during the proposed mining <br /> activity.The area is low density agricultural in nature.Visual exposure from <br /> the residential development to the north will be limited to a low number of <br /> residents. <br />