Laserfiche WebLink
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper , Governor | Robert W. Randall, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />February 3, 2017 <br /> <br /> <br />Joe Brinton <br />McClane Canyon Mining, LLC <br />2352 N 7th Street, Unit C <br />Grand Junction, CO 81501 <br /> <br /> <br />Re: McClane Canyon Mine (Permit No. C-1980 -004 ) <br /> Proposed Decision <br /> Permit Revision Application No. 2 (PR-2) <br /> <br /> <br />Dear Mr. Brinton: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision <br />Package for Permit Revision No. 2 at the McClane Canyon Mine . Notice of the proposed decision <br />will be published in the The Daily Sentinel as soon as possible. The first publication will initiate <br />the thirty (30) day public comment period for the Division's decision. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved <br />revision application was sent to the Office of Surface Mining and the Bureau of Land <br />Management. The material should be sent within 15 days of final approval. <br /> <br />Please be advised that federal mine plan approval may need to be obtained from the Office of <br />Surface Mining Reclamation and Enforcement (OSM). OSM approval, in addition to State permit <br />approval, is required, before operations affecting federal coal may commence. <br /> <br />Please refer to the Performance Bond heading on the enclosed prop osed decision form. If the <br />amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br />bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond or <br />rider to your existing bond that equals or exceeds the Revised Liability. This Permit Revision must <br />not be implemented until this proposed decision becomes final and until any required increase in <br />bond is submitted to and approved by the Division. <br />