My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-02_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2017-02-02_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:19 PM
Creation date
2/2/2017 3:16:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
2/2/2017
Doc Name
Request for Technical Revision
From
Ouray Silver Mines Inc
To
DMS
Type & Sequence
TR9
Email Name
THM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ouray Silver Mines Inc. <br /> Technical Revision 09 February 1,2017 <br /> Mill equipment will be removed and repurposed or sold upon final reclamation. Reagents will be <br /> removed from site, either sent back to the vendors or disposed of as appropriate under hazardous <br /> waste regulations. Mill upgrades do not result in additional disturbance. <br /> 7.2 Mill Discharge and Treatment <br /> Any construction occurring on site related to mill discharge treatment system will utilize the <br /> appropriate storm water control measures. Upon final reclamation, the treatment system be <br /> removed, associated structures removed and the area reclaimed in a manner consistent with the <br /> existing permit. <br /> 7.3 Water Quality Monitoring Update <br /> Reclamation considerations for this proposed change are limited. The MWP Inlet station <br /> consists of the parshall flume and structure already onsite. Because the sampling station is <br /> already onsite, no additional reclamation bond is warranted. <br /> 7.4 Buildings <br /> All new buildings proposed herein will be dismantled and removed from site in accordance with <br /> existing permit specifications. Any rolling stock will be removed from site and sold and/or <br /> reclaimed.Non-permanent structures such as the propane sheds and Laydown Storage Area <br /> structure can be quickly disassembled and removed from site. Each structure has no foundation <br /> making removal a relatively simple task. The proposed changes result in 7,414 sq. ft. of new <br /> building foundation,which will be left in place when the building is dismantled. <br /> 7.5 Sale of Waste Rock and Tailings Blend <br /> The sale of waste rock blended with tailings is straight forward from a reclamation standpoint. <br /> The temporary waste rock pad and crusher area will be graded, capped and revegetated. Because <br /> the sale blended waste rock and tailings does not represent any new disturbed area,this proposed <br /> change is already accounted for in the existing reclamation plan and bond. <br /> Page 14 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.