My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-02_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2017-02-02_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:19 PM
Creation date
2/2/2017 3:16:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
2/2/2017
Doc Name
Request for Technical Revision
From
Ouray Silver Mines Inc
To
DMS
Type & Sequence
TR9
Email Name
THM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1876* � 1313 Sherman Street,Room 215 Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 2012-032 Site Name: Revenue Mine <br /> County Ouray TR# 1 DRMS Use onl <br /> Y Permittee: <br /> Oura Silver Mines Inc. RECEIVED <br /> Operator(If Other than Permittee): JEB 0 2 2017 <br /> DIVISION OF RECLAMATION <br /> Permittee Representative: Clinton L. Fletcher MINING AND SAFETY <br /> Please provide a brief description of the proposed revision: The attached TR proposes building upgrades and <br /> expansions that will faciliate winter operations, mill water treatment and discharge, updates water quality <br /> monitoring, and proposes to allow the sale of of a waste rock-tailings blend for road aggregate use. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> I IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 1 l Od, 112d(1, 2 or 3) $1006 <br /> Annual Fee/Report: CW 2016 <br /> 2017 due 2/5/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.