Laserfiche WebLink
© MIBIT C RECEIVED <br /> PETERS PIT <br /> FEB 0 2 2017 <br /> RECLAMATION PLAN ----- -T— ' <br /> Pit depth 15-20ft DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> The topsoil will be removed by a dozer and loader with 12-40 inches I✓O K <br /> of overburden&topsoil moved as needed from West to East when f ! <br /> reclaiming the old pit,the stockpile will be removed as needed out of <br /> the working area,In the middle of the pit,gravel will be pushed in a <br /> pile with a in <br /> and then loaded on trucks <br /> ESTIMATED COST FOR RECLAMATION <br /> Dozer 200 hours a$160 00= 32,DDD DO <br /> Loader 200 hours x$100 00= 20,000 00 <br /> Grader 170 hours x$85 00= 14,450 00 ' <br /> Tillage&Planting 500 00 <br /> Seed $59 00 acre x 11 8= 696 DO , <br /> Man his <br /> SO hours z$1500= 75000 ' <br /> GRAND TOTAL 68,39600 <br /> x <br /> Pr+ SC41e <br /> O�rG i nJ dt I P,4,s-n,RE 4.Ah1J _ <br /> Y6/0RK Dj?EcTrOtJ <br /> I__S4-R��t-1�StStdtC�i- <br /> Aofv � OSeV,4L <br /> I—lb'— 070// <br />