My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-01_REPORT - M2004042 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2004042
>
2016-09-01_REPORT - M2004042 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 1:28:40 PM
Creation date
2/1/2017 4:52:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004042
IBM Index Class Name
Report
Doc Date
9/1/2016
Doc Name
Annual Fee/Report/Map
From
Ralph/Randy Porco
To
DRMS
Annual Report Year
2016
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Total acres in various stages of reclamation, since permitted mining activities began: Page 4 of 5 <br />Total acres Total acres Total acres Total acres <br />backfilled: (j 2 seeded w/ 7 2 w/topsoil / ,2 mulched wl + (� <br />approved mix: replaced: approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />graded: 9 x fertilized w/ replacement rate (tons/ac): <br />apvd fertilizer: depth (in.): <br />Seed Fertilizer Mulch <br />applicationL j application application <br />method: 6 rOaR CQS method: method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N:`A <br />If "YES", indicate the weed species, control area, control type, application rate and treatment ate on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit?YES NO N.'A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)?YES NO N.A <br />If "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office oft tate <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N1A <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO(ZD <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N --'A <br />19. Is your basis for legal right to enter still valid? YES NO <br />20. Does your permit require you to submit monitoring information annually? YESNO N/AIf "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7-12 and 14. UPDATED <br />MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.