My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-09_ENFORCEMENT - M1981185 (2)
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1981185
>
2017-01-09_ENFORCEMENT - M1981185 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 4:16:38 PM
Creation date
2/1/2017 3:49:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Enforcement
Doc Date
1/9/2017
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Wilcat Mining Corporation
Email Name
LJW
GRM
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and stabilization related to all outstanding corrective actions asset for& In t re December <br />2011 Order no later than <br />May 15, 2016. Teqared work spe4kaly iricded�t"R <br />o <br />taiksrfecdin hsZ,3,wd4of thDeamber207wtpg <br />Order. <br />a May Day 1 portal stabilization and maintenance; <br />■ stabilization ofthe Chleff'ort land the arses mad Immediately '- <br />above; <br />reclamation of Lithe Deadwood Gulch at tha May I?ay 2 and Chief <br />Portah and <br />initiate all water quality charatterization, monttnrfag and :- <br />reporting as required under Rule SA21[8], (9) and (11L) far a <br />Designated Mining{3peratioa. <br />S. The Boards March 2016 Order also required water quality e, . <br />characterization sampling to begin no later than June 15, 2016, with the first quarter <br />report due to the Division within 30 days oirecelpt of an <br />*U to reports The Hoard <br />ordered that Operator complete the required work outiindd abova In paragraph 3 and <br />set forth to the December 2011 Order no later than July 1.2M=-' <br />6. On June 10, x016, the D lvislon received awdt�ia request from the Operator <br />to be added to the Board's June 22, 2016, Board meeting agenda so that Operator could <br />request that the Doaard grautadditional time to comply with rile corrective action in the <br />.March 2016 Order_ " <br />7. At a herring during the Hoard's June 22, 2016 meeting, the Operator requested <br />sin extension until Oftber IS, 2016, to complete all to pdred corrective adios in the March <br />2016Order. As grounds forthe extension the Qperator testifiedt at the VS. Army Corps of <br />Engineers requires a study before granting the Operator a permit for a culvert that is needed <br />as partof the reclamation of Little Deadwood Gulch at the May Day 2 and Chief Portal. The <br />Division objected to the extent of the request and argued that theextension should be <br />Wilted to the deadline for the Operator to complete reclamation of i itrle Deadwood GWdL <br />The Division argued that the study required by the US. Array Corps of Engineers does not <br />Impact the Operator's abfEty to complete the remaining requiredcorrectiveactions <br />S. The Board granted the Operator's request ror an extension of the deadline to <br />complete the work required ror the reclamation of Little Deadwood Gulch at the May Day 2 <br />and CislefPortal to Octaberl5, 2016, with all other work due to be completed by the <br />original deadline off* 1, 2016. <br />9. On November.23,.Z016,1&e Operator, drmugh counsel, submitted a letter to <br />the ]XVIdon cord the Board requeating•reLhstamm ut of pamaltnumber M-1987.-195. <br />10 The Operator has completed the corrective actions set forth in the March <br />2016 Order, <br />wildcat Mining Corporation <br />May Day Idalm Gampkx/M 2981-285 <br />
The URL can be used to link to this page
Your browser does not support the video tag.