Laserfiche WebLink
HYDROLOGIC CHARACTERIZATION AND MONITORING PLAN <br />Table 5. Baseline and Routine Monitoring Frequencies <br />Routine Monitoring <br />Baseline Monitoring <br />Rising Limb <br />April 3 to May 13 <br />Peak Flow <br />April 21 to June 26 <br />Low Flow <br />July 10 to October 8 <br />Month <br />Flow / Level <br />Field <br />Parameters <br />Laboratory <br />Analysis <br />January <br />February <br />March <br />April <br />X <br />X <br />X <br />M <br />May <br />X <br />X <br />X <br />June <br />X <br />X <br />X <br />July <br />X <br />X <br />X <br />August <br />X <br />X <br />X <br />September <br />X <br />X <br />X <br />October <br />November <br />December <br />Adapted from CDRMS (2006) <br />13 <br />Revised 09/07- PRI 2; 08/16- TRI 39 HydroGeo, Inc <br />