Laserfiche WebLink
be accessed from either existing or new mine portals. As additional information which <br /> may affect the Southfield Permit is obtained and verified, EFCI will work closely with the <br /> MLRD to evaluate and address future permitting requirements and scheduling. <br /> While the mine was actively operating, the total permit area encompassed approximately <br /> 2,735.6 acres. This total included approximately 2,713.7 acres in the mine area and 21.9 <br /> acres in the loadout area. As described in previous sections, the mine is now in <br /> reclamation only status. Final bond release has been approved for the vast majority of <br /> the mine site area and for all of the loadout area. Through approved revision to the <br /> permit, the permit area at the mine site now encompasses approximately 1.15 acres. <br /> 2.05 - 8 <br /> TR-47 Revised August 2016 <br />