Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-7- 2016 Annual Reclamation Report <br />12. South Fan - Overburden stockpiles 10 and 11, south fan borrow area and <br />portion of access road no. 3. Reference map SL -16-009. Phase I Bond <br />Release was approved on 0.9 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.9 acres with SL -8 on <br />November 14, 2015. Located in the NEY4, Section 2, T11 S, R98W, 6th <br />P.M. <br />Area - 0.9 acres <br />Date - October 2000 <br />Seed Mix - "Seed Mix, Table 14-6" <br />Phase III Bond Release — 0.9 acres <br />13. 2 West Portals - Portals & Overburden stockpile 13. Reference Exhibit <br />58. The two steep sloped portal areas were extensively roughened and <br />re -seeded due to poor establishment of vegetation from the 2000 seeding. <br />Phase I Bond Release was approved on 0.3 acres with SL -2 on October <br />27, 2003. Phase II & III Bond Release was approved on 0.3 acres with <br />SL -8 on November 14, 2015. Located in the NE%, Section 11, T1IS, <br />R98W, 6th P.M. <br />Area - 0.3 acres <br />Date - October 2000; (0.2 acres re -seeded in October 2005) <br />Seed Mix - "Seed Mix, Table 14-6"; (Re -seed "Salt Tolerant Seed Mix, <br />Table 14-15") <br />Phase III Bond Release — 0.3 acres <br />14. North Decline Mine Dewatering System - Permanent Mine Dewatering <br />Point installed and reclaimed during 2002. Phase I Bond Release was <br />approved on 0.5 acres with SL -2 on October 27, 2003. Phase II & III Bond <br />Release was approved on 0.5 acres with SL -8 on November 14, 2015. <br />Located in EY2NE% and NE%SE'/, Section 34, T10S, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 0.5 acres <br />15. Roadside Refuse Borrow Area - Area east of the Roadside Refuse Pile <br />excavated during 2002 for cover material for the Roadside Refuse Pile. <br />Phase I Bond Release was approved on 4.5 acres with SL -2 on October <br />27, 2003. Phase II Bond Release on 4.5 acres and Phase III Bond <br />Release on 3.4 acres were approved with SL -8 on November 14, 2015. <br />Located in SEY4 Section 34, T1 OS, R98W, 6th P.M. <br />Area — 4.5 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release — 3.4 acres <br />16. Roadside Refuse Disposal Area (including new Upper Diversion <br />