My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-31_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2017-01-31_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 7:13:02 AM
Creation date
2/1/2017 6:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/31/2017
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Annual Reclamation Report
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-5- 2016 Annual Reclamation Report <br />Release on 0.4 acres were approved with SL -8 on November 14, 2015. <br />Phase III Bond Release on 0.5 acres were approved with SL -9 on January <br />3, 2017. Located in the N'/2NE%, Section 34 and the NW'/4NW'/o, Section <br />35, T10S, R98W, 6th P.M. <br />Area — 0.9 acres <br />Date - October, 2011 <br />Seed Mix - "Seed Mix, Table 14-8" Upland Components <br />Phase III Bond Release — 0.9 acres <br />Permanent Disturbance - North Decline - The West diversion ditch <br />#1, East diversion ditches #1 & #2, the 12" CMP and the 12" V - <br />ditches, 1.3 acres, are approved as permanent features. Also, <br />access road #2 at the North Decline, 0.4 acres, is approved as a <br />permanent feature. Phase I & II Bond Release on 1.7 acres and <br />Phase III Bond Release on 0.5 acres were approved with SL -8 on <br />November 14, 2015. Located in the N'/2NE'/4, Section 34 and the <br />NW%NW'/4, Section 35, T10S, R98W, 6th P.M. <br />Area — 1.7 Acres <br />Phase III Bond Release — 0.5 acres <br />6. North Decline - treatment building, A -substation and power line between <br />A and A -substations. Phase I Bond Release was approved on 0.1 acres <br />with SL -2 on October 27, 2003. Phase II & III Bond Release was <br />approved on 0.1 acres with SL -8 on November 14, 2015. Located in <br />E'/2NE% and NE'/4SE%, Section 34, T10S, R98W, 6th P.M. <br />Area - 0.1 acres <br />Date - Spring 1993 <br />Seed Mix -"Seed Mix, Table 14-9" <br />Phase III Bond Release — 0.1 acres <br />7. NW Intake Portal - Backfill portal located in NW%NE'/, Section 34, T10S, <br />R98W, 6th P.M. Phase I Bond Release was approved on 0.1 acres with <br />SL -2 on October 27, 2003. Phase II & III Bond Release was approved on <br />0.1 acres with SL -8 on November 14, 2015. <br />Area - 0.1 acres <br />Date - Summer 1993 <br />Seed Mix - No seed mix information on file. <br />Phase III Bond Release — 0.1 acres <br />8. Cameo Refuse Disposal Area No. 1 - Covered benches 1, 2, & 3. Phase <br />I Bond Release was approved on 10.3 acres with SL -2 on October 27, <br />2003. Phase II & III Bond Release was approved on 10.3 acres with SL -8 <br />on November 14, 2015. Located in the SE'/4 Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 10.3 acres <br />Date - July 1994 <br />Seed Mix - "Seed Mix, Table 14-10" <br />Phase III Bond Release — 10.3 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.