My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-31_REVISION - P2013002
>
Day Forward
>
Revision
>
Prospect
>
P2013002
>
2017-01-31_REVISION - P2013002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:53 AM
Creation date
1/31/2017 2:31:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013002
IBM Index Class Name
Revision
Doc Date
1/31/2017
Doc Name
Adequacy Review #2
From
BLM Royal Gorge Field Office
To
Zephyr Gold
Type & Sequence
MD3
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> 4. The proposed cut depth for these access roads will generate a significant amount of cut <br /> material. Please clarify where this material will be placed, how it will be managed upon <br /> removal, and how it will be used in the final regrading and reclamation efforts. <br /> 5. Per 43 CFR 3809.11(b), a plan of operations will need to be submitted for bulk sampling <br /> involving removal of 1,000 tons or more of presumed ore for testing. Please clarify a total <br /> tonnage removed to date, as well as what is proposed for MD-3. <br /> 6. Please clarify the methodology for mud pit construction in the roadway, management of <br /> drilling fluids and reclamation. <br /> Until a complete Notice Modification(or Plan of Operations) is filed with this office,the BLM is <br /> unable to determine that your proposed operations will not result in unnecessary or undue <br /> degradation as defined under 43 CFR 3809.5. <br /> Required Financial Guarantee—The Colorado Division of Reclamation, Mining and Safety <br /> (CDRMS) currently holds a financial guarantee in the amount of$51,275 for these exploration <br /> operations. This office will coordinate with CDRMS on the reclamation cost estimate you <br /> provided for this project. <br /> The financial guarantee must be redeemable by both the Secretary and the State and BLM must <br /> concur in the approval, release, or forfeiture of a financial guarantee for public lands. Therefore, <br /> please coordinate with CDRMS to obtain the appropriate paperwork that will include BLM as a <br /> co-obligee on the financial guarantee for this operation. <br /> If you have any questions,please contact Stephanie Carter at 719.269.8551. <br /> Sincerely, <br /> 9 Z-t <br /> nR Keith E. Berger <br /> Field Manager <br /> Royal Gorge Field Office <br /> cc: Angela Bellantoni, Ph.D., EAI <br /> Tim Cazier, CDRMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.