Laserfiche WebLink
• Appropriate soil erosion and sediment controls will be used and maintained in effective <br />operating condition during construction. All exposed soil and other fills will be <br />permanently stabilized at the earliest practicable date. NHN will also attempt to perform <br />work during periods of low -flow or no -flow. <br />• The North Haul Road and fill area will be properly maintained, including maintenance to <br />ensure public safety and compliance with applicable NWP general conditions. <br />• The temporary fill material will be removed in its entirety and the affected areas returned <br />to pre -construction elevations upon completion of mining and reclamation activities north <br />of Meehan Draw. <br />• Upon removal of the temporary fill material, the affected areas will be vegetated using <br />the Dryland Pasture revegetation procedures described in Section 2.05.4(2)(e). <br />The disturbance to this wetland area will be mitigated as described in NHN's Nationwide <br />General Permit No. 21 - Surface Coal Mining Activities (Section 404) from the U.S. Army Corp <br />of Engineers. A copy of the approved Nationwide 21 permit is on file at the New Horizon Mine <br />office and available for review at the Division's request. <br />Section 2.05.6(2) Page 6 April 2016 (PR -01) <br />